WATER SOFTENER

PRESSURE

TANK

BYPASS PLUMBING

RECOMMENDED

IF

OPTIONAL BP2000

BYPASS VALVE

IS NOT USED.

BRINE TANK

FROM

WELL PUMP

MINIMUM 10 FEET

BETWEEN

WATER SOFTENER OUTLET

AND

WATER HEATER INLET

WATER SOFTENER

BYPASS PLUMBING

RECOMMENDED

IF

OPTIONAL BP2000

BYPASS VALVE

IS NOT USED.

TO

DRAIN

TO

OUTSIDE

TAP

BRINE TANK

WATER

HEATER

DRAIN LINE

AIR GAP

ADAPTER

FROM

WATER MAIN

COLD

HOT

MINIMUM 10 FEET

BETWEEN

WATER SOFTENER OUTLET

AND

WATER HEATER INLET

LOCATE WATER SOFTENER

AS CLOSE AS POSSIBLE

TO BRINE TANK.

A SIX FOOT LENGTH OF 3/8" O.D.

BRINE LINE POLYTUBE

SUPPLIED WITH BRINE TANK.

OVERFLOW GRAVITY DRAIN - ONLY USED IN CASE OF MALFUNCTION IN THE BRINE SHUTOFF. DO NOT CONNECT TO CONTROL VALVE DRAIN LINE.

IF UNIT IS INSTALLED WHERE OVERFLOW COULD CAUSE WATER DAMAGE, CONNECT TUBING AND RUN TO FLOOR DRAIN. DO NOT RUN TUBING ABOVE OVERFLOW HEIGHT.

WELL WATER

INSTALLATION

CITY WATER

INSTALLATION

WATER

METER

TO

DRAIN

TO

OUTSIDE

TAP

WATER

HEATER

DRAIN LINE

AIR GAP

ADAPTER

COLD

HOT

LOCATE WATER SOFTENER

AS CLOSE AS POSSIBLE

TO BRINE TANK.

A SIX FOOT LENGTH OF 3/8" O.D.

BRINE LINE POLYTUBE

SUPPLIED WITH BRINE TANK.

LOCATE WATER SOFTENER CLOSE TO A DRAIN.

AVOID OVERHEAD DRAIN LINES IF POSSIBLE TO

PREVENT BACK PRESSURE ON BRINE INJECTOR.

IF OVERHEAD DRAIN LINE IS USED AND EXCEEDS

5 FEET ABOVE CONNECTION ON CONTROL VALVE

OR

IF DRAIN LINE EXCEEDS 20 FEET IN LENGTH,

DRAIN LINE PIPE SIZE SHOULD BE MINIMUM 3/4".

OVERFLOW GRAVITY DRAIN - ONLY USED IN CASE OF MALFUNCTION IN THE BRINE SHUTOFF. DO NOT CONNECT TO CONTROL VALVE DRAIN LINE.

IF UNIT IS INSTALLED WHERE OVERFLOW COULD CAUSE WATER DAMAGE, CONNECT TUBING AND RUN TO FLOOR DRAIN. DO NOT RUN TUBING ABOVE OVERFLOW HEIGHT.

LOCATE WATER SOFTENER CLOSE TO A DRAIN.

AVOID OVERHEAD DRAIN LINES IF POSSIBLE TO

PREVENT BACK PRESSURE ON BRINE INJECTOR.

IF OVERHEAD DRAIN LINE IS USED AND EXCEEDS

5 FEET ABOVE CONNECTION ON CONTROL VALVE

OR

IF DRAIN LINE EXCEEDS 20 FEET IN LENGTH,

DRAIN LINE PIPE SIZE SHOULD BE MINIMUM 3/4".

Click to buy NOW!

PD

F-XCHANGE

w

ww

.docu-track.c

om

Click to buy NOW!

PD

F-XCHANGE

w

ww

.docu-track.c

om

6. The brine refill flow control assembly is installed in an easy to access refill 

elbow  located  on  top  of  the  control  valve.  The  refill  flow  control  assembly  is 

attached to the control valve with a locking clip. The locking clip allows the elbow 

to rotate 270 degrees so the outlet can be oriented towards the brine tank.

7.  Connect  the  brine  line  polytubing  found  with  the  brine  tank  to  the  brine 

connection on the control valve. The control valve has a standard refill elbow 

to which a 3/8” flexible tube can be connected, see

 

below. One polytube insert 

is  shipped  on  the  brine  line  elbow’s  locking  clip.  Remove  this  white  polytube 

insert and replace the locking clip. The second polytube insert is taped to the 

top of the brine well cap in the brine tank. Press the polytube inserts into each 

end of the provided brine tubing, press the polytube with insert into the nut on 

the brine fitting. Tighten nut securely to create a pressure tight connection. The 

nut, gripper and retainer sleeve is a three-piece assembly that can come apart 

from the elbow body. Parts must be reassembled exactly as shown to function 

properly.  If  the  nut  is  completely  removed  from  the  body,  slip  the  nut,  plastic 

gripper and retainer sleeve on to the tube then tighten on to the fitting. Make sure 

the floor is clean beneath the brine tank and that it is level and smooth. Install 

brine tubing to the brine tank using the above instructions.

BRINE LINE FITTING CONNECTIONS

DRAIN LINE FITTING CONNECTION USING 5/8" POLY TUBE

Click to buy NOW!

PD

F-XCHANGE

w

ww

.docu-track.c

om

Click to buy NOW!

PD

F-XCHANGE

w

ww

.docu-track.c

om

POLYTUBE

8. A 1/2” (inside diameter, not provided) gravity drain line should be connected 

to the overflow fitting on the side of the brine tank. This overflow is in case of a 

malfunction in the brine shut off. If the unit is installed where water may flow in the 

event of an overflow and cause water damage, connect a length of flexible tubing 

and run to a drain below the level of the overflow. 

(Do not connect the tubing to 

the drain line on the control valve. Do not run tubing above overflow height 

at any point.)

A

G

A

F

B

D

C

E

Summary of Contents for IRONSOFT 7-FESLX-24B

Page 1: ...ars of trouble free service When installed in accordance with the following instructions and if given reasonable care clear soft water will be the result For servicing and future inspection purposes please file this booklet with your important documents 7 FESLX 24B 7 FESLX 32B 7 FESLX 45B 7 FESLX 60B 7 FESLXC 24B ELECTRONIC IRONSOFT WATER SOFTENER WITH THE X FACTOR CONTROL VALVE PROGRAMMED FOR PRE...

Page 2: ... for each ppm iron for total compensated hardness Use the total compensated hardness number for hardness setting on page 8 Total Grains of Compensated Hardness per Day INSTALLATION DATE SERIAL NUMBER INSTALLER NAME PHONE ADDRESS TABLE OF CONTENTS Job Specifications 2 Pre Installation Review 3 General Installation and Service Warnings 3 Bypass Valve Operation 4 Installation Instructions Diagrams 5 ...

Page 3: ...QUALITY If sand or sediment is present in the water supply a sediment filter should be installed ahead of the water softener Your water softener has been designed to adequately reduce compensated hardness from levels up to 100 grains per gallon Ferrous bicarbonate clear water and or ferric hydroxide red water iron levels up to 10 ppm can also be reduced Ferrous iron is dissolved in water and not v...

Page 4: ...rs are glass filled Noryl or equivalent and the nuts and caps are glass filled polypropylene All seals are self lubricating EPDM to help prevent valve seizing after long periods of non use Internal o rings can easily be replaced if service is required The bypass consists of two interchangeable plug valves that are operated independently by red arrow shaped handles The handles identify the flow dir...

Page 5: ...rical plumbing should be done in accordance to all local codes INSTALLATION INSTRUCTIONS 5 The drain connection may be made using either 5 8 polytube see below or a 3 4 female adapter The polytube insert is shipped attached to the drain line elbow s locking clip Press the insert into the drain line tubing tubing not provided Loosen the nut of the drain line elbow Press the 5 8 polytube with insert...

Page 6: ...PDF XCHANGE w w w docu track c o m C l i c k t o b u y N O W PDF XCHANGE w w w docu track c o m 6 The brine refill flow control assembly is installed in an easy to access refill elbow located on top of the control valve The refill flow control assembly is attached to the control valve with a locking clip The locking clip allows the elbow to rotate 270 degrees so the outlet can be oriented towards ...

Page 7: ... salt level should be checked every couple of weeks to determine salt usage Keeping the brine tank salt level at least 1 2 full is recommended SANITIZING Use 2 oz of 5 unscented household chlorine bleach for each cubic foot of resin Pour bleach directly into the 4 diameter white brine well located inside the brine tank Press and hold the REGEN for 5 6 seconds until the motor starts running Allow s...

Page 8: ... the total compensated hardness number from Page 2 Use the or buttons to set the hardness number The default is 20 with value ranges from 1 to 150 in 1 grain increments Press NEXT to go to step 3 Press REGEN to exit Installer Display Settings STEP 3 Day Override Set the maximum number of days between regenerations If value set to OFF regeneration initiation is based solely on volume used If value ...

Page 9: ...urn to previous digit Banner Text Set the banner text up to a maximum of 44 characters Use the or to select letters of the alphabet numbers ampersand or a space in the banner text Press NEXT to forward to the next character or to exit the Installer Display Settings STEP 1 STEP 2 STEP 3 STEP 4 A non rechargeable coin cell battery is located on the circuit board used only to maintain the time of day...

Page 10: ...C Adaptor Input Voltage Hertz 120V AC 60 Hz AC Adaptor Output Voltage Current 12V AC 500 mA 3 Volt Lithium Coin Cell Battery type 2032 PC Board Relay Terminal Block DC Output Voltage 12V DC Relay Specifications 12V DC Relay with a coil resistance not less than 80 ohms If mounting the relay under the control valve cover check for proper mounting location dimensions on the backplate 10 15 257 9 3 39...

Page 11: ... Pipe Connector Assy for Model 7 FESLX 60 1 5 A4102 24V Replacement media for 7 FESLX 24 1 A4102 32V Replacement media for 7 FESLX 32 1 A4102 45V Replacement media for 7 FESLX 45 1 A4102 60V Replacement media for 7 FESLX 60 1 Dwg No Order No Description Qty 1 J7952 15x17x36 Brine Tank with Cover for Model 7 FESLX 24 32 45 1 G2136 18x40 Brine Tank with Cover for Model 7 FESLX 60 1 2 H1031 4x28 Slot...

Page 12: ...ush down to fully seat Battery replacement is 3 volt lithium coin cell type 2032 Correct Battery Orientation 1 2 3 5 6 4 X FACTOR FRONT COVER AND DRIVE ASSEMBLY After completing any valve maintenance involving the drive assembly or the drive cap assembly and pistons unplug power source jack from the printed circuit board black wire and plug back in or press and hold NEXT and REGEN buttons for 3 se...

Page 13: ...detailed service instructions 1 2 3 4 5 INJECTOR CAP INJECTOR SCREEN INJECTOR PLUG AND O RING Drawing No Order No Description Qty 1 V3005 Spacer Stack Assembly 1 2 V3004 Drive Cap Assy 1 3 V3178LP Back Plate 1 4 V3011 Piston Downflow Assy 1 5 V3174 Regenerant Piston 1 6 V3135 O ring 228 1 7 V3180 O ring 337 1 8 V3105 O ring 215 Distributor Tube 1 Not Shown V3001 Body Assy Downflow 1 2 6 5 4 1 3 7 ...

Page 14: ...CRITICAL OR HEALTH EFFECT APPLICATIONS The nut and caps are designed to be unscrewed or tightened by hand or with the service spanner wrench see page 16 If necessary a pliers can be used to unscrew the nut or cap Do not use a pipe wrench to tighten or loosen nuts or caps Do not place a screwdriver in slots on caps and or tap with a hammer Refer to page 21 for detailed service instructions Drawing ...

Page 15: ...awing No Order No Description Quantity 1 V3151 Nut 1 Quick Connect 2 2 V3150 Split Ring 2 3 V3105 O Ring 215 2 4 V3191 Vertical Adapter 2 INSTALLATION FITTING ASSEMBLIES 4 Water Flow Proper DLFC orientation directs water flow towards the washer face with rounded edge Do not use pipe dope or other sealants on threads Teflon tape must be used on threads of 3 4 NPT connection unless using 5 8 polytub...

Page 16: ...etailed operation and service instructions Order No V3007 01 Description Fitting 1 PVC Solvent 90 Assembly Drawing No Order No Description Quantity 1 V3151 Nut 1 Quick Connect 2 2 V3150 Split Ring 2 3 V3105 O Ring 215 2 4 V3189 Fitting 1 PVC Solvent 90 2 Order No V3007 02 Description Fitting 1 Brass Sweat Assembly Drawing No Order No Description Quantity 1 V3151 Nut 1 Quick Connect 2 2 V3150 Split...

Page 17: ... Split Ring 2 3 V3105 O Ring 215 2 4 V3628 Ftg 3 4 Brass Shark Bite 2 1 1 4 NPT 1 BSPT 1 NPT 3 2 1 4 1 1 4 NPT 1 BSPT 1 NPT 1 3 2 4 CHANGE CHANGE R MAT LTR DATE BY LTR DATE TITLE DATE SCALE PART REV DWG Clack Corporation 4462DURAFORMLANE WINDSOR WI53598 TELEPHONENO 1 608 846 3010 C C 1 2 12 1 05 D A K WS1F1_1 2 Sol1_1 4_0707 XX 01 XXX 005 X XX 1 64 Volume in 3 MODEL DWG WS1F1_1 2 Sol1_1 4_0707 CON...

Page 18: ...EPHONE NO 1 608 846 3010 C C Water Specialist 35 Water Softerner Cabinet CONFIG DWG R DWG CHANGE 1 OF 1 X XX X Units Inch Water Specialist CWS 18 Cabinet The Water Specialist CWS 18 C accepts 18 tall mineral tanks 5 8 44 5 8 20 34 1 2 13 13 16 CHANGE XX X 1 10 CabinetAsm_GeneralDim35 MODEL XXX MAT LTR DATE BY LTR DATE TITLE DATE SCALE PART REV 35 Cabinet CabinetAsm_1 15 Clack Corporation SHEET 446...

Page 19: ...resistance is felt before latching then notches are not fully engaged the piston rod is not in hole the wires are jammed between the drive bracket and drive back plate or the gear is not engaging the drive cap assembly To inspect the drive gears the drive gear cover needs to be removed Before trying to remove the gear cover the drive bracket must be removed from the drive back plate Refer to the i...

Page 20: ...en the drive cap assembly Continue to tighten the drive cap assembly using a screwdriver as a ratchet until the black o ring on the spacer stack assembly is no longer visible through the drain port Excessive force can break the notches molded into the drive back plate Make certain that the main drive gear still turns freely The exact position of the piston is not important as long as the main driv...

Page 21: ...d not be used to clean the injector Scoring the injector or increasing the diameter of the hole could change the operating parameters of the injector Push the plug s and or injectors firmly in place replace the screen and hand tighten the injector cap WATER METER The water meter assembly is connected to the PC board by a wire If the entire water meter assembly is to be replaced remove the control ...

Page 22: ...lace meter f Defective PC Board f Replace PC Board 4 Control valve regenerates at wrong time of day a Power outage a Reset time of day If PC Board has battery back up present the battery may be depleted See Front Cover and Drive Assembly drawing for instructions b Time of day not set correctly b Reset to correct time of day c Time of regeneration set incorrectly c Reset regeneration time d Control...

Page 23: ...r leaking fixtures that may be exhausting capacity or system is undersized 10 Residual regenerant being delivered to service a Low water pressure a Check incoming water pressure water pressure must remain at minimum of 25 psi b Incorrect injector size b Replace injector with correct size for the application c Restricted drain line c Check drain line for restrictions or debris and clean 11 Excessiv...

Page 24: ... supply from PC Board for 5 seconds and then reconnect c Missing reduction gears c Replace missing gears 15 Err 102 Control valve motor ran too short and was unable to find the next cycle position and stalled a Foreign material is lodged in control valve a Open up control valve and pull out piston assembly and seal stack assembly for inspection Press NEXT and REGEN buttons for 3 seconds to resynch...

Page 25: ...ss NEXT and REGEN buttons for 3 seconds to resynchronize software with piston position or disconnect power supply from PC Board for 5 seconds and then reconnect Then re program valve to proper setting b MAV NHBP motor wire not connected to PC Board b Connect MAV NHBP motor to PC Board two pin connection labeled DRIVE Press NEXT and REGEN buttons for 3 seconds to resynchronize software with piston ...

Page 26: ...PAGE 26 A DIVISION OF C B TOOL CO 1340 MANHEIM PIKE LANCASTER PA 17601 3196 TEL 717 397 3521 FAX 717 392 0266 www lancasterwatertreatment com E mail info lancasterpump com 5 17 ...

Reviews: