background image

REV.                 3/12-15-04

Table of Contents

Lancair  International  Inc.,  Represented by Neico Aviation  Inc., Copyright  ©  2000  ,  Redmond,  OR  97756

TOC-VI

Chapter 25:  Aft Windows ..................................................... 25-1

1. INTRODUCTION .................................................................................... 25-1

2. PARTS LIST ............................................................................................. 25-1

3. CONSTRUCTION PROCEDURE .......................................................... 25-2

A.

Preparing the Fuselage Shell .................................................................................... 25-2

B.

Preparing the Windows ........................................................................................... 25-3

C.

Window Installation ................................................................................................ 25-5

Chapter 26: Firewall Forward (part 2) Continental 550 ........ 26-1

1. INTRODUCTION .................................................................................... 26-1

2. PARTS LIST ............................................................................................. 26-1

3. CONSTRUCTION PROCEDURES ........................................................ 26-4

A.

Mounting the Engine ............................................................................................... 26-4

B.

Propeller/Spinner .................................................................................................... 26-5

C.

Cowling .................................................................................................................. 26-6

D.

Baffling ................................................................................................................... 26-9

E.

Engine Control Systems ........................................................................................ 26-22

F.

Manifold Pressure and Tachometer ....................................................................... 26-25

Tachometer............................................................................................................... 26-25

G.

Fuel Systems ........................................................................................................ 26-26

H.

Oil Systems .......................................................................................................... 26-33

Oil Temperature Sensor ........................................................................................... 26-33

Oil Pressure Sensor .................................................................................................. 26-33

I.

Vacuum System Installation (Optional) ................................................................... 26-35

Chapter 27:  General Wiring .................................................. 27-1

1. INTRODUCTION .................................................................................... 27-1

2. PARTS LIST ............................................................................................. 27-2

3. CONSTRUCTION PROCEDURES ........................................................ 27-3

A.

Basic Wiring Techniques ......................................................................................... 27-3

B.

Legacy General Wiring ............................................................................................ 27-4

C.

Basic Aircraft Wiring ............................................................................................... 27-6

D.

Landing Gear Wiring ............................................................................................... 27-7

E.

Lights Wiring .......................................................................................................... 27-8

F.

Electric Fuel Pump ................................................................................................ 27-10

G.

Trim System Wiring ............................................................................................... 27-11

H.

Flap Wiring ........................................................................................................... 27-13

Setting the Flap Limit Stops ...................................................................................... 27-15

I.

Pitot Tube Heat Wiring .......................................................................................... 27-16

J.

Electric Door Seal Wiring ...................................................................................... 27-16

K.

Antenna Placement ............................................................................................... 27-17

Chapter 28:  Finishing Techniques ......................................... 28-1

1. INTRODUCTION .................................................................................... 28-1

Painting and Interiors .............................................................................................. 28-1

2. PARTS LIST ............................................................................................. 28-1

3. CONSTRUCTION PROCEDURES ........................................................ 28-2

A.

Bid Tapes ............................................................................................................... 28-2

B.

Mixing Micro .......................................................................................................... 28-2

C.

General Surface Preparation ................................................................................... 28-2

D.

Priming Materials .................................................................................................... 28-3

E.

Paint Preparations ................................................................................................... 28-4

F.

Painting .................................................................................................................. 28-4

G.

Base Colors ........................................................................................................... 28-4

H.

Trim Colors ............................................................................................................ 28-5

Summary of Contents for Legacy

Page 1: ...Chapter1 REV 0 02 15 02 INTRODUCTION 1 1 Lancair International Inc Represented by Neico Aviation Inc Copyright 2000 Redmond OR 97756 ASSEMBLY MANUAL FOR THE LANCAIR LEGACY...

Page 2: ...Chapter1 REV 0 02 15 02 INTRODUCTION 1 2 Lancair International Inc Represented by Neico Aviation Inc Copyright 2000 Redmond OR 97756...

Page 3: ...eAnnoying 2 Wide BidTapes 1 35 T CardboardTemplates 1 35 U BuildingLight 1 35 V BuildingStraight 1 36 Straight Trailing Edges 1 36 W Control Systems 1 38 Pushrod Tips 1 38 X Hydraulic Systems 1 40 Tub...

Page 4: ...2 A WingInstallationandRemoval 5 2 Chapter 6 Aileron Controls 6 1 1 INTRODUCTION 6 1 2 PARTS LIST 6 1 3 CONSTRUCTION PROCEDURES 6 3 A Control Stick Installation 6 3 B AileronControlsRigging 6 4 C Cou...

Page 5: ...t 12 1 2 PARTS LIST 12 1 3 CONSTRUCTION PROCEDURES 12 2 A CounterweightInstallation 12 2 B LeftVertical Skin Installation 12 3 Typical Vertical Tail Cross Section 12 3 C ElevatorWeldmentAccess Panel 1...

Page 6: ...own Lights 16 15 G Gear Micro SwitchWiring 16 16 H Gear Pressure SwitchWiring 16 17 I GearWiring Schematic 16 18 J Hydraulic Gear Start Up andTest Operations 16 19 Adding Hydraulic Fluid 16 19 Start u...

Page 7: ...TRUCTION PROCEDURES 21 3 A CenterTorque Tube Support 21 3 B Flap Installation 21 7 C Flap Motor Installation 21 9 Flap MotorAlignment 21 10 FlapAdjustments 21 10 D BondingtheWingTrailing Edge 21 11 Ch...

Page 8: ...Systems 26 33 Oil Temperature Sensor 26 33 Oil Pressure Sensor 26 33 I Vacuum System Installation Optional 26 35 Chapter 27 General Wiring 27 1 1 INTRODUCTION 27 1 2 PARTS LIST 27 2 3 CONSTRUCTION PRO...

Reviews: