32
5
Commissioning
The following materials are required for the installation.
Fig. 5-2 Feed-through flange with seal and screws
The following material is required for the electrical connection.
Specific cable specifications, see chapter
Designation
Specification
1 Feed-through flange
Appropriate to the pilot burner, with radially
arranged grub screws for securing the outer tube.
1 Seal
4 x M12 screws (GFI48/GFI70)
4 x M16 screws (GFI89)
4 washers
4 screw nuts
Designation
Specification
Terminal lug
Ring terminal
Ground cable
Ignition cable
Ionisation cable