11
FIXING THE GREENHOUSE BASE TO THE GROUND
406
125
Niveau 0 - sol fini
2544
1922
• Position the greenhouse base in the desired location at a level position on a filled floor.
• Locate and mark the location of the base legs as shown bellow.
• Unter the four legs, mark a square of 300 x 300 mm and dig to a depth of 450 mm.
• Place the GREENHOUSE BASE, level it but CAUTION, do not fill the holes before the complete
assembly of the greenhouse.
FIXING ON SOIL
3166 mm
2544 mm
6
04
5
21
Niveau 0 - sol fini
OR
406
125
Niveau 0 - sol fini
2544
1922
3166 mm
2544 mm
450 m
m
300 mm
FIXING ON CONCRETE SLAB
450 m
m
300 mm
Earth or concrete filling
It is strongly recommended
to fill the holes with concrete
for a better hold on the ground.
6
04
5
21
Niveau 0 - sol fini
2544
1922
A
A
It remains to your free choice and decision to
use the suitable fastening means according to
the supports you chose (wood border, building
stones, cement plates etc.)
Rawplug fastening inside
the greenhouse base
Screws and rawplugs
not provided
Detail A-A
A
A
A
A