background image

1

Revision date: 08.27.19

©2019 GrowSpan

All Rights Reserved. Reproduction 

is prohibited without permission.

STK#  

DIMENSIONS

113466H (B & C)  26' W x 5' H x 24' L

113467H (B & C)  26' W x 5' H x 36' L

113468H (B & C)  26' W x 5' H x 48' L

Actual building design and dimensions may differ from example shown.

GrowSpan

 Roll-Up Low Pro Tunnel

Summary of Contents for 113466H B

Page 1: ...ved Reproduction is prohibited without permission STK DIMENSIONS 113466H B C 26 W x 5 H x 24 L 113467H B C 26 W x 5 H x 36 L 113468H B C 26 W x 5 H x 48 L Actual building design and dimensions may dif...

Page 2: ...chor assembly is an integral part of the high tunnel construction Improper anchoring may cause tunnel instability Failing to anchor tunnel properly may void manufacturer s warranty and may cause serio...

Page 3: ...concrete continue with next procedure 12 Install tighten and secure end panels 13 Install tighten and secure main cover 14 Read care and maintenance information 15 Complete and return all warranty in...

Page 4: ...not allow cover to remain open for extended time Periodically unroll cover for cleaning and to allow it to dry Remove debris and objects that accumulate on cover Use tools that will not damage cover w...

Page 5: ...ort Lock FA4110 FA4115 Hook Loop Fasteners FA4110 FA4115 102856 End Clamp 102197 Aluminum U Channel Film Cover only 104642 A Angle Bracket 102198 Spring for Aluminum U Channel Film Cover only 102548 C...

Page 6: ...of frame is measured from center to center of ground posts 2 After placing first corner stake string a line the frame width center to center of ground posts and drive second corner stake 3 String a l...

Page 7: ...ring frame as described in the MUST READ document do not auger holes for ground posts Instead follow the steps to mark ground post locations and drive posts into the ground at those locations See info...

Page 8: ...ts in place See diagram below All posts to be plumb before adding concrete Use mounting holes in posts and customer supplied fasteners and stakes to hold posts in place 3 Add concrete to anchor posts...

Page 9: ...Wrap screws and slices with duct tape Gather parts Rafter pipes LPT166ES1W26 LPT166PS1W26 166S051 166S063 FA4472B Tek screws 100442 magnetic nut setter Duct tape STEP 1 Select rafter pipes to assembl...

Page 10: ...n assistant hold until next rafter is added and connected with purlins 3 Set next rafter in place and secure using 5 16 bolts and nuts ATTENTION Only the two end rafters use 102856 end clamps as shown...

Page 11: ...art section for additional information and pipe identification Purlin runs end to end down center at top of each rafter ATTENTION At this time do not install brackets that secure square peak purlin to...

Page 12: ...f cover is shown rolled to peak Cover is installed later 2 Assemble end panel conduit using the 1 315 pipe noted above secure each pipe joint with Tek screw and tape over screw Slide conduit into pock...

Page 13: ...of end panel Attach each end of conduit to ground post using Tek screws and QH1330 brackets 3 Measure between end rafter ground posts to determine final conduit length Cut assembled conduit to fit if...

Page 14: ...as needed so zippers function properly then continue 10 Drive a Tek screw through each clip and into rafter Position screws in a location that will not contact cover material Tape over screw if neede...

Page 15: ...alternative steps for installation On the outside of frame attach first baseboard ground post using two 2 5 16 carriage bolts and nuts Countersink bolt heads if carriage bolts are not used Continue a...

Page 16: ...ION 115287 Gather parts 115287 curtain stabilizer bars GS0049 splice plate FA4472B Tek screws 100442 magnetic nut setter 5 115287 115287 Side Views with baseboard without baseboard Tab Install bar as...

Page 17: ...dditional information 2 Assemble 1 315 roll up conduits one for each side See side profile diagrams in Quick Start section for details and pipe identification NOTE Secure each pipe splice with a Tek s...

Page 18: ...below for frame cover material Solid Black Silver Cover B Diagrams show attaching aluminum bar 110155 through cover and into peak purlin of frame Install Tek screws approximately 17 on center through...

Page 19: ...ame after removing excess material Check cover length NOTE Once cover is wrapped around conduit conduit should rest on ground next to frame when length is correct See photo inset right 3 Unroll cover...

Page 20: ...to 36 extension pipe using one 1 Tek screw 2 Slide 6 easy spin pipe 166P006 onto free end of 36 extension pipe 3 Attach universal joint to end of 36 extension pipe 4 Attach assembly to roll up cover...

Page 21: ...sive 7 Repeat Steps 3 6 to apply hook hoop fastener in all remaining locations on frame 8 Beginning with one side roll cover down to stabilizer bar and lock cover into place 9 Verify cover is position...

Page 22: ...12 from rafter splice Positon B Approx 36 from top center of rafter Positions C Mid point between A B GROUND LEVEL X X X X X X X Length 48 GROUND LEVEL X X X X Length 24 GROUND LEVEL X X X X X X Leng...

Page 23: ...Repeat as cover rolls down tunnel frame End fasteners can be reached when cover is locked down Film is shown Actual cover may differ ATTENTION Never leave cover partially open Cover must be fully ope...

Page 24: ...Guide GrowSpan Roll Up Low Pro Tunnel 26 Wide Frame ATTENTION Diagram shows optional baseboard installed below stabilizer bar If baseboard is not used install stabilizer bar at ground level Ground Le...

Page 25: ...9 25 11 1 2 CENTER TO CENTER OF GROUND POSTS 2 0 EMBEDMENT 2 5 1 8 12 1 7 8 1 4 3 8 5 5 15 16 GROUND LEVEL TO STRUCTURE PEAK GROUND LEVEL ATTENTION Diagram shows optional baseboard installed below sta...

Page 26: ...ND POST 102675 RAFTER LPT166ES1W26 RAFTER LPT166ES1W26 RAFTER LPT166PS1W26 RAFTER 166S063 RAFTER 166S063 RAFTER 166S051 RAFTER 166S051 ALUMINUM BAR 110155 IF APPLICABLE PURLIN BRACKET END 102856 MID 1...

Page 27: ...ar If baseboard is not used install stabilizer bar at ground level 4 0 RAFTER SPACING 24 0 CENTER TO CENTER OF GROUND POSTS 2 0 EMBEDMENT GROUND LEVEL SIDEWALL PURLIN SIDEWALL PURLIN ROLLUP CONDUIT 13...

Page 28: ...ROUND LEVEL SIDEWALL PURLIN PEAK PURLIN STABILIZER BAR 131S075 5 131P0735 1 PEAK PURLIN 102897 4 S15P048 1 STABILIZER BAR SIDEWALL PURLIN ROLLUP CONDUIT 115287 3 CUSTOMER SUPPLIED BASEBOARD OPTIONAL A...

Page 29: ...ar If baseboard is not used install stabilizer bar at ground level 4 0 RAFTER SPACING 48 0 CENTER TO CENTER OF GROUND POSTS 2 0 EMBEDMENT GROUND LEVEL SIDEWALL PURLIN PEAK PURLIN STABILIZER BAR 131S07...

Page 30: ...30 113466_67_68HBC Revision date 08 27 19 Connections VIEW 7 VIEW 8 CONNECTION ATTENTION Optional baseboard not shown...

Page 31: ...VIEW 3 VIEW 2 VIEW 4 VIEW 6 VIEW 7 NOTE VIEW 8 VIEW 5 VIEW 9 VIEW 1 5X 14 X 1 TEK SCREW SPLICE PLATE GS0049 STABILIZER BAR STABILIZER BAR RAFTER 2X 12 X 1 TEK SCREW GROUND POST STABILIZER BAR install...

Page 32: ...PLODED VIEW 2X 12 X 1 TEK SCREW EVERY 17 ALUMINUM BAR 110155 BLACKOUT MATERIAL PURLIN 1 5 SQ BLACKOUT MATERIAL CONNECTION PEAK IF APPLICABLE CLEAR FILM CONNECTION PEAK IF APPLICABLE NOTE BLACKOUT COVE...

Page 33: ...ce Photo above shows frame with film cover Cross connectors secure side purlin to rafters Stabilizer bar is shown secured to outside of frame and runs near ground level the full length of the frame Th...

Reviews: