![Lambrecht SYNMET-IND Series Stw-Manual Download Page 9](http://html.mh-extra.com/html/lambrecht/synmet-ind-series/synmet-ind-series_stw-manual_671568009.webp)
X:\PmDoku\Geräte\Synmet NAV\englisch\SYNMET MANUALE 1.doc
STW Manual
Page 9 of 25
SYNMET-IND has to be grounded according to technical standards. See wiring diagrams SWF/SKF for more
details.
Figure: SYNMET with opened terminal room cover
Figure: Sequence of an EMV cable gland with plastic corpus and the cable shield .
Figure: Termination of the cable
The electrical wiring has to be done according to the individually provided LAMBRECHT wiring plan (marked
"SKF ???" or "SWF ????" in its lower right-hand edge). This wiring plan also indicates the used AWG-color-
code. Find this plan as an annex to the manuals.
All wiring can be done without tools. To ease the wiring process, all terminal blocks can be removed from their
sockets by simply pulling them upwards. Push the end-slices of each cable into the appropriate green terminal
blocks until they are in a secure contact-position (to be tested by gently pulling on the cable). To dismount
cables, simply press the orange buttons with a small screw driver, to release the wires from the springs. The
connecting to ground has to be fastened to the screw at the outer right-hand side of the SYNMET-system.