A
SSEMBLY
I
NSTRUCTION
A
SSEMBLY
STAGE
#4
Attach Mast & H-Handlebar to the Main Base
Assembly Hardware Required:
(*Hardware is Preinstalled in Base Assembly)
#30
Truss Head Socket Bolts*
Qty. 4
#33
Spring Washer
Qty. 2
#31
Curved Washer*
Qty. 4
#34
Flat Washer
Qty. 2
#32
Allen
Bolt
Qty.
2
Assembly Description:
A) Remove the preinstalled hardware from the mast mounting area of the Base Assembly.
B)
Connect the
Upper Heart Rate Cable
(#18) to the
Lower
Heart Rate Cable
(#19). (
FIGURE #4
)
C)
Connect the
Upper
Data Cable Assembly
(#20) to the
Lower Data Cable Assembly
(#21). (
FIGURE #5
)
D)
Tuck the excess cable lengths into frame tubing and slide the
Handlebar Mast
(#13) down on to the
Base
Assembly
(#1). Align the mounting holes and secure the mast in place by using the previously installed; 4-
Truss
Head Socket Bolts
(#30) and 4-
Curved Washers
(#31).
E)
Secure the
H-Shaped Handlebar
(#14) to the front cradle mounting of the
Handlebar Mast
(#14) using the
Mounting Clamp
(#16), 2-
Allen Bolts
(#32), 2-
Spring Washers
(#33) , and 2-
Flat Washers
(#34).
F)
Once the
H-Handlebar
is secure, place the
Mounting Cover
(#15) over the hardware / clamping area..
♦
Assembly Stage #4 completed
34
16
33
32
15
18
19
21
20
13
30
P
AGE
9
USE TOOL
14
31
FIGURE #4
FIGURE #5