Installation
Preinstallation
CAUTION:
All work must be performed by qualified personnel trained in the proper application,
installation, and maintenance of plumbing, steam and electrical equipment or systems in
accordance with all applicable codes and regulations.
The pump and valve as received in this kit are factory paired and wirelessly communicate
water temperature and pump status with each other.
Before installation of the pump and valve, complete the following:
• Shut off water supply.
• Turn off hot water source.
• Drain the lines.
• Allow the system to cool to a safe handling temperature, below 100°F (38°C) and a
zero pressure condition.
Installation
8
Laing Thermotech ACT-4 wireless Potable Hot Water Recirculation Kit Installation, Operation and Maintenance
Manual