13
What you will receive with the machine.
3
7
4 5
1
6
2
1.
Tool kit
2.
Mounting feet.
3.
Leveling bolts.
4.
Cabinet keys.
5.
Spindle spacers and shims.
6.
Spindle wrench.
7.
Grease gun
CLEANING THE MACHINE
Remove the rust protection grease with WD 40 or similar solvent
It is important that you remove all the grease and re lubricate with a Te on based
lubricant as Te on has less tendency to attract sawdust and cause clogging.
LEVELING THE MACHINE
The machine is provided with 4 leveling bolts and 4 mounting feet. Move your
machine to its nal position and using a sprit level on the table adjust the leveling
Assembly and Setup
Summary of Contents for RPM5
Page 2: ......
Page 25: ...25 Exploded View Drawings and Parts List...
Page 26: ...26...
Page 27: ...27...
Page 28: ...28...
Page 29: ...29...
Page 30: ...30...
Page 31: ...31...
Page 32: ...32...
Page 33: ...33...
Page 34: ...34...
Page 35: ...35...
Page 36: ...36...
Page 37: ...37...
Page 38: ...38...
Page 39: ...39...
Page 40: ...40...
Page 41: ...41...
Page 42: ...42...
Page 43: ...43...
Page 44: ...44...
Page 45: ...45...
Page 46: ...46...
Page 47: ...47 Electrical Drawings...
Page 48: ...48...
Page 49: ...49...