15
Tool rest clamping nut and washer
Tool rest assembled
Connecting the electrical supply.
Ensure that the electrical supply corresponds with that of the machine
[Single phase
220V].It is recommended that you use a 30-amp main breaker.
Note. A qualified electrician must carry out the installation.
Cleaning the machine.
Remove the rust protection grease with WD 40 or a similar solvent. It is important that you
remove all the grease and re lubricate with a Teflon-based lubricant. Teflon has fewer
tendencies to attract sawdust, and cause clogging.
Fitting the rotating centre.
Ensure that the bore of the tail stock is clean. The rotating centre has a number No 2 Morse
taper that fits into the tail stock. Push the centre into the tail stock bore firmly, and ensure
that it is securely located. To remove the centre, push the shaft into the back of the tail stock
and give it a sharp knock. This will remove the rotating centre.
Note.
Do not leave the removal shaft in the tail stock with the machine running.
Tail stock rotating centre
Rotating centre removal rod
Summary of Contents for L A175017
Page 2: ......
Page 8: ...8 Lathe bed The bed is a machined heavy casting...
Page 23: ...23...
Page 24: ...24...
Page 25: ...25...
Page 27: ...27 48 WASHER 4 6 98 49 INVERTER COVER 1 WASHER 5 2...