Keep children away from the assembly area.
solution and rinse with cold clean water.
This is a multi-part assembly, it is recommended to allow between 8-16 hours.
The parts should be checked and laid out close to hand.
It is advisable to keep all small parts (screws etc..) in a bowl to avoid losing them.
Keep roof clear of snow and leaves.
When selecting a site, aim to choose a level surface in a sunny position
away from overhanging trees but not exposed to excessive wind.
Do Not use acetone, abrasive cleaners or other special detergents
as these may damage the polycarbonate panels.
When your greenhouse needs cleaning, use a mild detergent
Do not attempt to assemble the greenhouse in wet or windy conditions.
Take care to avoid hazards such as overhead power cables during installation.
Do not lean against or push the greenhouse frame during installation.
Do not position your greenhouse in an area exposed to excessive wind.
Hot items such as recently used barbecues, should not be stored in the greenhouse.
Check for hidden pipes or cables before installing the greenhouse.
We strongly recommend the use of work gloves, shoes and
safety goggles during assembly.
The greenhouse parts may be wrapped in plastic, small parts may be in
plastic bags, take care to keep these away from children.
The greenhouse must be installed on a flat / level foundation,
please see the foundation guide.
Do not attempt to assemble the greenhouse if you are tired, prone to dizzy spells
or have taken any intoxicating substances such as alcohol.
If using a step ladder or power tools, take care to follow the manufacturer’s
safety advice.
Summary of Contents for GH1246
Page 3: ......
Page 5: ......
Page 7: ......
Page 8: ......
Page 9: ......
Page 11: ......
Page 13: ......
Page 14: ...Please ensure 1 extra F4bolt and nut is placed in each part 18 for use later ...
Page 15: ......
Page 16: ......
Page 17: ......
Page 18: ...part 8 ...
Page 19: ......
Page 20: ... Silicone should be added to frame to help seal the panels in ...