background image

 

User Manual LabModul 240

 

Page 7

 

www.labtec.de

 

Test 

step

 

Operation

 

Comments

 

Controls

 

1.1.1

 

Wet the outlet valve rubber slice. Breathing con-

nection  of mask close with the dust cap.

 

Flutter valve must be thoroughly moist

 

 

1.1.2

 

Mount mask on test head, pull straps tight, 

inflate test head (3)

 

A few seconds is usually long 

enough 

 

    

 

1.1.3

 

Adjust negative pressure to exactly 

-

 #

 

mbar 

(6)

 

By means of pressure relief valve 

(7)

 

 

1.1.4

 

Pressure increase after # min at the  LCD (LP) 

read off and compare with  the nominal value

 

 

 

1.1.5

 

Deflate test head (4), remove mask

 

 

 

 

 

 

 

1.2.1

 

Wet the outlet valve rubber slice. Breathing con-

nection  of mask close with the dust cap.

 

Test only possible with tight

-

set A

-

valve. Use mark specific adaptors.

 

 

1.2.2

 

Mount mask on test head, pull straps tight, 

inflate test head (3)

 

A few seconds is usually long 

enough 

 

 

1.2.3

 

Adjust negative pressure to exactly 

-

 #

 

mbar 

(5)

 

By means of pressure relief valve 

(7)

 

 

1.2.4

 

Pressure increase after # min at the  LCD (LP) 

read off and compare with  the nominal value

 

 

 

1.2.5

 

Deflate test head (4), remove mask

 

 

 

 

 

 

 

1.3.1

 

Mount mask on test head, pull straps tight, 

inflate test head

 

A few seconds is usually long 

enough 

 

 

1.3.2

 

Pump  +10  l/min switch on.

 

 

 

1.3.3

 

Opening pressure at the LCD (LP) read off and 

compare with  the nominal value

 

 

 

1.3.4

 

Pump  +10  l/min switch off (8).

 

 

 

1.3.5

 

Deflate test head (4), remove mask

 

 

 

1

 

Leakage

 

1.1

 

Leakage test with open A

-

valve at 

--

#

 

mbar (standard test, should always be carried out)

 

1.2

 

Leakage test with sealed A

-

valve at +#

 

mbar (performed to locate any leak detected by test 1.1)

 

1.3

 

Opening pressure of the outlet valve

 

A 1

 

testing full

-

face masks

 

Summary of Contents for LabModul 240 Series

Page 1: ...2 3 device description 3 4 technical data 3 5 operating elements 4 6 component description 5 7 description of the operating elements 5 8 commissioning 6 9 care and maintenance 6 Attachments Performin...

Page 2: ...ed and certified Labtec service technician and tested and calibrated by him or her using a Labtec calibration device The list of current certified employees training partners and service technicians i...

Page 3: ...fitted at the factory Connection requirements A 230 240 V 50 60 Hz power supply is requi red to operate the test stand As medium pressure connection Euro coupling and nipple are available as standard...

Page 4: ...10 l min switching valve 9 Inhalation 10 l min switching valve 10 Fill CPS switching valve 11 Empty CPS switching valve 12 Relieve medium pressure tactile valve A test stand housing B Panel optional C...

Page 5: ...um pump With the built in vacuum pump the required air currents are generated and the probe is infla ted or deflated The desired air flow rate can be set in the software from 2 12 l min Processor The...

Page 6: ...g nipple of the medium pressure device connection and the line of the demand valve to the EURO quick coupling of the medium pres sure device connection If the SCBA to be tested does not have a Euro co...

Page 7: ...specific adaptors 1 2 2 Mount mask on test head pull straps tight inflate test head 3 A few seconds is usually long enough 1 2 3 Adjust negative pressure to exactly mbar 5 By means of pressure relief...

Page 8: ...with the setpoint All further tests require high pressure Regulator in conjunction with a Connect the SCBA to the test device Medium pressure hose from the PA regulator of a SCBA must with Device conn...

Page 9: ...ssure flows into the device 3 2 2 Close the bottle of the SCBA Tester DUT are under pressure 3 2 3 Read the medium pressure on the LCD display MP and compare with setpoint 3 2 4 After a specified time...

Page 10: ...pressure is reached 5 1 8 Lower the pressure to the required internal pres sure with the switch 11 if necessary with but ton 12 approach and turn on the stopwatch Setting the required Settling time 5...

Page 11: ...h in EEC Guideline 2016 42 EG and EMC 2014 30 EU including all changes and addendums to date thereto The above mentioned product meets the following standards and guidelines Nous Vous Confirmons que l...

Reviews: