LABTEC ECO dynamic User Manual Download Page 11

 

User Manual Labtec ECO

 

page 11

 

www.labtec.de

 

A 2

 

Testing of demand valves

 

2. 

 

Complete device (Demand Valve)

 

2.3

 

Opening pressure / cut

-

in pressure at # l/min suction 

 

2.4 

 

Static overpressure 

 

2.5 

 

Inhalation resistance at 40 x 2.5 l/min breathing (only with ECO dynamic)

 

Step

 

Activity

 

Comment

 

operating 

elements

 

2.3.1

 

Connect demand valve in combination with a

 

SCBA base unit to the test device.

 

Check correct device connection!

 

 

2.3.2

 

Open high pressure main valve with main valve 

switch.

 

High pressure flows into the unit and 

is present in the unit.

 

 

2.3.3

 

Switch on vacuum pump with switch 10l/min 

Inhalation to produce constant flow.

 

until the regulator opens and the 

 

maximum negative pressure point is 

reached

 

 

2.3.4

 

Read the opening / closing pressure of the de-

mand valve on the display (LP).

 

 

 

2.3.5

 

Switch off the pump by pressing the 10/lmin In-

halation switch again.

 

 

 

2.3.6

 

Close high pressure main valve with main valve 

switch.

 

 

 

2.2.7

 

Completely vent the test device.

 

 

 

 

 

 

 

2.4.1

 

Connect demand valve in combination with a

 

SCBA base unit to the test device.

 

Check correct device connection!

 

 

2.4.2

 

Open high pressure main valve with main valve 

switch.

 

High pressure flows into the unit and 

is present in the unit.

 

 

2.4.3

 

Read the static overpressure of the opened de-

mand valve on the display (LP) and compare it 

with the setpoint.

 

Test only for positive pressure lung 

valves

 

 

2.4.4

 

Close high pressure main valve with main valve 

switch.

 

 

 

2.4.5

 

Completely vent the test device.

 

 

 

 

 

 

 

2.5.1

 

Connect demand valve in combination with a

 

SCBA base unit to the test device.

 

Check correct device connection!

 

 

2.5.2

 

Open high pressure main valve with main valve 

switch.

 

High pressure flows into the unit and 

is present in the unit.

 

 

2.5.3

 

Start breathing with switch for artificial lung

 

 

 

2.5.4

 

Read the low pressure on the display (LP).

 

Read the minimum low pressure 

during the inhalation

 

 

2.5.5

 

Stop breathing with switch for artificial lung

 

 

 

2.5.6

 

Close high pressure main valve with main valve 

switch.

 

 

 

2.5.7

 

Completely vent the test device.

 

 

 

Summary of Contents for ECO dynamic

Page 1: ...ec de User Manual Labtec ECO static dynamic Labtec No Content Page 1 foreword 2 2 safety instructions 2 3 device description 3 4 technical data 4 5 component description 5 6 operating elements 6 7 com...

Page 2: ...ained and certified Labtec service technician and tested and calibrated by him or her using a Labtec calibration device The list of current certified employees trai ning partners and service technicia...

Page 3: ...PC connec ted to test device via swivel arm mounting incl pre installed LabNet Profi test software Module S safety valve test System com ponent and module for automatic medium pressure increase for SC...

Page 4: ...on bar 0 25 0 5 low pressure sensor measuring range precision mbar 50 0 50 0 05 complete device Max permissible operating pressure bar 400 power supply V Hz 230 240 50 60 total power electricity W max...

Page 5: ...linder or pipe supply Attention Never connect or disconnect lines under pressure Device connection E High pressure device socket for connecting the pressure regulator of the SCBA to be tested CPS test...

Page 6: ...switches it off Switch button for 10 l m inhalation Forcing pump 10 l min is set in motion by pressing this button LED shows function Pressing button again switches it off Switch button for CPS infla...

Page 7: ...atus is screwed completely into the inter nal thread of the device connection For tests in the medium pressure range dis connect the medium pressure line of the SCBA at the Euro coupling and connect i...

Page 8: ...C Guideline 2016 42 EG and EMC 2014 30 EU including all changes and addendums to date thereto The above mentioned product meets the following standards and guidelines Nous Vous Confirmons que l appare...

Page 9: ...h head inflation button The inflation time varies from mask type to mask type 1 2 3 Set test vacuum with negative pressure button to setpoint value mbar Switch on stop watch Adjust the test pressure w...

Page 10: ...r a preset time min read the pressure change on the display LP and compare with the setpoint 2 1 5 Completely vent the test device All further tests require high pressure Check correct device connecti...

Page 11: ...ith main valve switch 2 2 7 Completely vent the test device 2 4 1 Connect demand valve in combination with a SCBA base unit to the test device Check correct device connection 2 4 2 Open high pressure...

Page 12: ...t pressure until PA pressure gauge shows the set point Read off the SCBA manometer 3 1 5 Read the high pressure on the display HP and compare it with instrument pressure opt Repeat test steps 3 1 4 an...

Page 13: ...test device 5 3 1 Connect demand valve in combination with a SCBA base unit to the test device Check correct device connection 5 2 1 Open high pressure main valve with main valve switch High pressure...

Page 14: ...ation with a SCBA base unit to the test device Check correct device connection 5 4 2 Open high pressure main valve with main valve switch High pressure flows into the unit 5 4 3 Close high pressure ma...

Page 15: ...des Schalters CSA f llen das Bef llen des Anzugs stoppen when the required tightening internal pressure is reached 7 1 8 Press the CPS inflation switch again to stop fil ling the suit Setting the requ...

Reviews: