User Manual Labtec ECO
page 11
www.labtec.de
A 2
Testing of demand valves
2.
Complete device (Demand Valve)
2.3
Opening pressure / cut
-
in pressure at # l/min suction
2.4
Static overpressure
2.5
Inhalation resistance at 40 x 2.5 l/min breathing (only with ECO dynamic)
Step
Activity
Comment
operating
elements
2.3.1
Connect demand valve in combination with a
SCBA base unit to the test device.
Check correct device connection!
2.3.2
Open high pressure main valve with main valve
switch.
High pressure flows into the unit and
is present in the unit.
2.3.3
Switch on vacuum pump with switch 10l/min
Inhalation to produce constant flow.
until the regulator opens and the
maximum negative pressure point is
reached
2.3.4
Read the opening / closing pressure of the de-
mand valve on the display (LP).
2.3.5
Switch off the pump by pressing the 10/lmin In-
halation switch again.
2.3.6
Close high pressure main valve with main valve
switch.
2.2.7
Completely vent the test device.
2.4.1
Connect demand valve in combination with a
SCBA base unit to the test device.
Check correct device connection!
2.4.2
Open high pressure main valve with main valve
switch.
High pressure flows into the unit and
is present in the unit.
2.4.3
Read the static overpressure of the opened de-
mand valve on the display (LP) and compare it
with the setpoint.
Test only for positive pressure lung
valves
2.4.4
Close high pressure main valve with main valve
switch.
2.4.5
Completely vent the test device.
2.5.1
Connect demand valve in combination with a
SCBA base unit to the test device.
Check correct device connection!
2.5.2
Open high pressure main valve with main valve
switch.
High pressure flows into the unit and
is present in the unit.
2.5.3
Start breathing with switch for artificial lung
2.5.4
Read the low pressure on the display (LP).
Read the minimum low pressure
during the inhalation
2.5.5
Stop breathing with switch for artificial lung
2.5.6
Close high pressure main valve with main valve
switch.
2.5.7
Completely vent the test device.