Pivot Adjustment and Jaw Changeout Guide
Section 6
Page 7
MOBILE DEMOLITION PROCESSORS
12
13
14
PIVOT SHIMMING AND ASSEMBLY
12.) Install (2) bolts into shaft on the guide side to act
as “handles” for maneuvering the shaft.
13.) Partially install the left hand side main bearing in
order to start centering the shaft and upper.
14.) Fully install the right hand side main bearing. This
may take some maneuvering with the crane in order
to center the upper in the lower.
Summary of Contents for 513914
Page 1: ...Mobile Demolition Processors Part Number 513914 Safety Operation Maintenance Manual...
Page 4: ......
Page 20: ...Page 8 Section 2 About the Attachment MOBILE DEMOLITION PROCESSORS...
Page 30: ......
Page 74: ......
Page 77: ...Pivot Adjustment and Jaw Changeout Guide Section 6 Page 3 MOBILE DEMOLITION PROCESSORS...
Page 97: ......