background image

2.

Electrical Safety

2.1

Electrical Connections

Due  to  safety  none  of  the  Labnics  furnaces  that  use  over  16  amps  have  a  plug  while 
delivery.   Main connection of furnace over 16 amps should be managed through a circuit 
breaker and according to electrical diagram supplied together with this manual. 

Electrical plugs even at low amperes (< 16amps) are prone to create 

electrical arcs. We therefore strongly recommend using a circuit 

breaker of  appropriate amperes rather than the plug.

Any electrical connection to operate this furnace must be done by 

a Qualified Electrician .Accordingly any repairs or maintenance 

job requires a qualified technician.

The technician who is responsible of commissioning the furnace is 

also responsible to act in accordance the rules of safety of European 

Community. Technician is solely responsible of selection and use of 

appropriate circuit breaker and earth connections.

Single Phase Electrical Connection

Cable Color

Supply

Terminal Label

Brown

Phase

L

Blue

Neutral

N

Green-Yellow

Earth

E

Triphase Electrical Connection

Line number

Supply

Designation of Lines

1

Phase 1

L1

2

Phase 2

L2

3

Phase 3

L3

4

Neutral

N

Green-Yellow

Earth

E

Power supply must be close enough to enable the operator to cut off 
power easily in case of emergencies. 

Mains connection must incorporate an earthed isolating cut off switch. 

Never use an electrically conductive tool within the furnace while in 
operation

- 2 -

Summary of Contents for LSCF-100A

Page 1: ...Instruction Manual Model LHTF 100 Series Labnics Equipment High Temperature Tube Furnace Please read this manual carefully before using the instrument...

Page 2: ...Technical Properties 4 2 1 Temperature Controllers 4 2 2 Heating Elements 7 2 3 Refractory Insulation 8 2 4 Electrical Layout 8 3 What is PID Control 9 4 Points to Take Care While Operating the Furnac...

Page 3: ...serts slowly It is extremely important to remove the packing inserts from inside the furnace Operating the furnace without removal of safety inserts will cause heavy damage on the heating elements Use...

Page 4: ...b requires a qualified technician The technician who is responsible of commissioning the furnace is also responsible to act in accordance the rules of safety of European Community Technician is solely...

Page 5: ...d against risks to avoid any burns etc 6 Labnics furnaces are manufactured in conformity with CE Electromagnetic Emissions Directive Even though so electromagnetic emissions can effect some sensitive...

Page 6: ...tured at will and without informing 2 Furnace Components Related Technical Properties 2 1 Temperature Controllers Model Sensitivity PID Step definition Number of Number of Programs Segments DC 1010 1...

Page 7: ...active functions of the controller Insignia Description Active Color OUT1 OUT2 Output Relays power are active Green AT AutoTune is underway Orange AL1 AL2 AL3 Alarm signal underway Red MAN Controller...

Page 8: ...play any programming profile has to have the cooling stage defined as well Use a paper to draw your program profile before data feed in We advice the PVSTART option to be enabled to ease the running o...

Page 9: ...y Used to either to decrease a value or to inactivate a function 2 2 Heating Elements Labnics employs Kanthal originated heating elements in furnaces 2 2 1 Wire elements The basic advantages of Kantha...

Page 10: ...s of service as a heating element The resistance of Kanthal Super elements does not change due to ageing even after having been in operation for a long time at high temperatures Due to these propertie...

Page 11: ...erature and it should never be used over this temperature The heating elements and the concerned insulation are related with designated o maximum temperature of furnace It is most advicable to us a fu...

Page 12: ...a new one The old unbroken element should be kept aside to be used in pairs with an old element At high temperatures a glassy phase coating appears on SiC elements This coating although not harmful to...

Page 13: ...use insulation that appears loose Most of the time the very same insulation can be obtained from local market We can of course deliver the concerned insulation whenever requested B Replacement of Sol...

Page 14: ...ently asked questions FaultAnalysis 1 Furnace controller does not display when the I 0 switch turned on 1 1 Check the Mains supply Check the voltage present May be less than 220V 1 2 Check the fuses o...

Page 15: ...1 Electrical Other Requirements Phase Volts Frequency Medium Temp Humidity Single 220V 50Hz 5 C 40 C Max 85 Triphase 380 220V 50Hz 2 Control Panel Honeywell DC1010 UDC2500 Honeywell DC1010 Honeywell U...

Page 16: ...igits can be activated by pressing key By using and keys you can define the digits of the desired limit temperature After you have entered the limit temperature value please press set key in order to...

Page 17: ...ys in the manual mode and open red the I 0 switch Furnace will start heating directly to set temperature 2 Programme Mode See Section C page 11 and Section D page 15 for further details Press key cont...

Page 18: ...well time has expired 2 Use or key to select the requested recepie program number Please note that program number changes as the operator press or keys 3 Once a programme is chosen in order to run the...

Page 19: ...rogramme data during operation E Sample Program Honeywell UDC2500 There are four different alternatives in order to heat up the furnace with UDC2500Temperature Controller 1 Standard Heating 2 To defin...

Page 20: ...o next step ENDSEG End Segment max 12 The segment number which the programe will end RPUNIT Engineering Unit for Ramp TIME Defines heating up or cooling down speed Can be chosen as TIME Hr Min EU H C...

Page 21: ...t point Unit is Hr Min SG3RP RampTime 3 1hr SG4SP Soak SP 4 400 SG4TI SoakTime 4 1hr SG5RP RampTime 5 1hr 30min SG6SP Soak SP 6 250 SG6TI SoakTime 6 3hr 0min SG7RP RampTime 7 2hr 30min SG8SP Soak SP 8...

Page 22: ...rts Replaced Parts Recommended Action Required Yes Service Engineer s Name Signature Requisition Number Customer s Name Signature Date Stamp Page ____ Of ____ No Model Serial No Date Status OK Install...

Page 23: ...Labnics Equipment 43040 Christy St Fremont CA 94538 USA Toll Free 877 620 9992 Tel 925 271 4322 Fax 925 886 0400 Email info labnics com Website www labnics com...

Reviews: