![Labconco XPert 3930200 User Manual Download Page 6](http://html1.mh-extra.com/html/labconco/xpert-3930200/xpert-3930200_user-manual_3305537006.webp)
Product Service 1-800-522-7658
2
C
C
h
h
a
a
p
p
t
t
e
e
r
r
2
2
:
:
P
P
r
r
e
e
r
r
e
e
q
q
u
u
i
i
s
s
i
i
t
t
e
e
s
s
Before you install the vented enclosure, you need to prepare your site for
installation. Carefully examine the location where you intend to install the vented
enclosure. You must be certain that the area is level and of solid construction. In
addition, a dedicated source of electrical power should be located near the
installation site to power the accessory FilterMate Portable Exhauster, balance or
other apparatus. Additionally, a balance should be strategically placed in the lab to
provide efficient workflow.
Carefully read this chapter to learn the requirements for your installation site:
The support, vibration and movement requirements.
The temperature variation requirements.
The humidity and static electricity requirements.
The location and air current requirements.
The exhaust and blower requirements.
The electrical power requirements.
The space requirements.
Refer to Appendix B: XPert/XVS Dimensions for complete enclosure dimensions.
Refer to Appendix C: XPert/XVS Specifications for complete vented enclosure
electrical and environmental conditions, specifications and requirements.