
5
Product Service 1-800-522-7658
C
C
H
H
A
A
P
P
T
T
E
E
R
R
2
2
P
P
R
R
E
E
R
R
E
E
Q
Q
U
U
I
I
S
S
I
I
T
T
E
E
S
S
Before you install the Vertical Clean Bench, you need to prepare
your site for installation. You must be certain that the area is level
and of solid construction. In addition, a dedicated source of
electrical power should be located near the installation site to
power the Clean Bench, and other apparatus. Additionally, the
enclosure should be strategically placed in the lab to provide
efficient workflow.
Carefully read this chapter to learn the requirements for your
installation site:
•
The support, vibration and movement requirements.
•
The location and air current requirements.
•
The exhaust and blower requirements.
•
The electrical power requirements.
•
The space requirements.
Refer to
Appendix B: Dimensions
for complete Vertical Clean
Bench dimensions.
Refer to
Appendix C: Vertical Clean Bench Specifications
for
complete Vertical Clean Bench electrical and environmental
conditions, specifications and requirements.
Summary of Contents for Purifier 3970200
Page 60: ...56 Appendix C Vertical Clean Bench Specifications Product Service 1 800 522 7658 C 1 ...
Page 61: ...57 Appendix C Vertical Clean Bench Specifications Product Service 1 800 522 7658 C 2 ...
Page 62: ...58 Appendix C Vertical Clean Bench Specifications Product Service 1 800 522 7658 C 3 ...
Page 63: ...59 Appendix C Vertical Clean Bench Specifications Product Service 1 800 522 7658 C 4 ...