
Product Service 1-800-522-7658
7
Original instructions
C
HAPTER
2
P
REREQUISITES
Before you install your floor-mount laboratory fume hood, you need to prepare
your site for installation. Carefully examine the location and floor where you
intend to install your floor-mounted hood. You must be certain that the area is
level and of solid construction. In addition, a dedicated source of electrical power
must be located near the installation site.
Carefully read this chapter to learn the requirements for your installation site:
The location requirements.
The support requirements.
The exhaust requirements.
The electrical power requirements.
The service line requirements.
The space requirements.
Refer to
Appendix B: Protector XL Floor-Mounted Hood Dimensions
for
complete fume hood dimensions.
Refer to
Appendix C: Protector XL Floor-Mounted Hood Specifications
for
complete laboratory fume hood electrical and environmental conditions,
specifications and requirements.