background image

 

Product Service 1-800-522-7658 

43

 
 

A

A

p

p

p

p

e

e

n

n

d

d

i

i

x

x

 

 

A

A

:

:

 

 

R

R

e

e

p

p

l

l

a

a

c

c

e

e

m

m

e

e

n

n

t

t

 

 

P

P

a

a

r

r

t

t

s

s

 

 

 

The components that are available for your glove box are listed.  The parts 
shown are the most commonly requested.  If other parts are required, please 
contact Product Service. 

 

Item Qty.  Part 

Number 

Description 

1A 

1ea 

5232200 

Framed Glass Window (standard) 

1B 

1ea 

5236100 

Framed Acrylic Window (optional) 

2A 

1ea 

1230700 

Receptacle, 115V Duplex 

2B 

1ea 

1283900 

Receptacle, 230V Duplex 

2C 

1ea 

5232900 

Sealed Duplex, 115V Complete 

2D 

1ea 

5232901 

Sealed Duplex, 230V Complete 

2E 

1ea 

5233400 

Wallplate Duplex Gray 

3A 

1pr 

1640600 

9 ¾ size Neoprene Gloves (standard) 

3B 

1pr 

1640601 

9 ¾ size Butyl Gloves 

3C 

1pr 

1640602 

9 ¾ size Hypalon Gloves 

3D 

1pr 

1640500 

8 ½ size Neoprene Gloves 

3E 

1pr 

1640501 

8 ½ size Butyl Gloves 

3F 

1pr 

1640502 

8 ½ size Hypalon Gloves 

3G 2ea 1640000 

O-Rings 

3H 

2ea 

1965600 

Clamp – O-Ring Gloves 

1ea 

5236200 

Transfer Chamber Inner Support Sleeve 

1ea 

1307000 

Switch, Rocker (2 Position) 

6A 

1ea 

5225701 

Valve Kit (included on CA) 

6B 

1ea 

1409900 

Tube Support Insert 

6C 1ea 1408300 

Large 

Ferrule 

6D 1ea 1408400 

Small 

Ferrule 

6E 

1ea 

1413602 

Stainless Compression Nut 

6F 

1ea 

1413500 

Hose Connector (Secondary Method) 

6G 

order by the foot 

1539500 

Polyvinyl Chloride Tubing 3/8" OD x 3/16" ID 

6H 

order by the foot 

(25' coils) 

7396209 

FEP Tubing, Drying Train, 3/8" OD x 1/4" ID 

6I 

1ea 

1409901 

Tubing Insert, Drying Train, 3/8" OD x 1/4" ID 

1ea 

1365200 

Main Glove Box Pressure Gauge (included on CA) 

1ea 

1365300 

Transfer Chamber Vacuum Gauge (included on CA) 

9A 

1ea 

5222700 

Fluorescent Bulb, 8" Circleline FC8T9/CW, 22 Watt, 4 Pin 

9B 

1ea 

5222800 

Ballast, 115V 60 Hz 

9C 

1ea 

5222801 

Ballast, 230V 50 Hz (also used on 100V, 50 Hz) 

9D 

1ea 

5222802 

Ballast, 230V 60 Hz (also used on 100V, 60 Hz) 

9E 

1ea 

5242900 

Transformer, 230V to 100V (100V models only) 

10A 

1ea 

1305800 

Inlet Power Cord, 115V 

10B 

1ea 

1305900 

Inlet Power Cord, 230V 

11A 

1ea 

5226400 

Inner Transfer Door w/attached gasket (Complete Assy.) 

11B 

1ea 

5226500 

Outer Transfer Door w/attached gasket (Complete Assy.) 

11C 

1ea 

5226401 

Inner Door w/attached gasket only 

11D 

1ea 

5226501 

Outer Door w/attached gasket only 

12A 

1ea 

1327204 

Circuit Breaker, 5A, 115V 

12B 

4ea 

1327205 

Circuit Breaker, 2A, 230V 

12C 

1ea 

1327200 

Circuit Breaker, 3A, 115V 

13A 

REF. 

5226900 

Wiring Diagram, 115V 

13B 

REF. 

5226901 

Wiring Diagram, 230V 

14 

1ea 

5230600 

Pressure Relief Valve (included on CA) 

Summary of Contents for Precise Basic 5220000

Page 1: ...on card online at register labconco com User s Manual Precise Controlled Atmosphere Glove Boxes and Precise Basic Glove Boxes CA Models Voltage Frequency 5220100 115V 60 Hz 5220120 230V 50 Hz 5220121...

Page 2: ...00 a m and 6 00 p m Central Standard Time Part 5233701 Rev A ECO E766 Warranty Labconco provides a warranty on all parts and factory workmanship The warranty includes areas of defective material and w...

Page 3: ...o the Glove Ports 13 Connecting the Electrical Supply Source 13 Connect the Plumbing Lines for Gas Vacuum Drying Train 14 Validating the Glove Box 20 Oxygen Method Leak Testing Summary ISO 10648 2 22...

Page 4: ...IONS 46 APPENDIX D PRECISE CONTROLLED ATMOSPHERE PURGE FILL REDUCTION RATES 47 APPENDIX E LIFE SPAN FOR OXYGEN REMOVAL COLUMN MOISTURE TRAP REMOVAL 49 APPENDIX F IONIZER FAN PERFORMANCE CRITERIA 51 AP...

Page 5: ...ous materials Second it protects materials and laboratory equipment inside the main chamber from the effects of exposure to ambient air oxygen and moisture levels Third it provides a protective leak t...

Page 6: ...to provide efficient workflow and prevent operator interference from normal traffic flow Carefully read this chapter to learn the requirements for your installation site The support vibration and pre...

Page 7: ...ments The Precise Glove Boxes have been designed to rest on a typical 29 30 737mm 762mm deep work surface The height should be 35 40 for standing position Avoid placing the glove box in high traffic a...

Page 8: ...e explosive hazard or damage to property inside the glove box See Figures 3 1 3 2 and 3 3 in Chapter 3 for ventilation connection diagrams of the vent kits Electrical Requirements Electrical receptacl...

Page 9: ...cessory Pressure Controller and Chapter 7 for ordering information The Pressure Controller automatically monitors and controls pressures in both the main chamber and transfer chamber it also automates...

Page 10: ...ucture and work surface Connect an exhaust system to the pressure relief valve if applicable Install the gloves Connect the electrical supply Connect the plumbing lines for gas vacuum and drying train...

Page 11: ...using a floor jack Carefully remove the shrink wrap and carton on the glove box and inspect it for damage that may have occurred in transit If damaged notify the delivery carrier immediately and retai...

Page 12: ...or optimal comfort A height of 35 40 889mm 1016mm is appropriate for standing operation Labconco base stands from Chapter 7 may be adjusted in height from 33 40 838mm 1016mm Connecting the Exhaust to...

Page 13: ...onnections See Chapter 7 Accessories to add a pressure relief valve 5230600 to the Precise Basic Glove Box A 2 06 52 3mm diameter hole must be drilled into the Precise Basic Glove Box shell This hole...

Page 14: ...Chapter 3 Getting Started Product Service 1 800 522 7658 10 Figure 3 1 Pressure Relief Vent Kit 5242700...

Page 15: ...Chapter 3 Getting Started Product Service 1 800 522 7658 11 Figure 3 2 HEPA Filtered Pressure Relief Vent Kit 5238500...

Page 16: ...Chapter 3 Getting Started Product Service 1 800 522 7658 12 Figure 3 3 Carbon Filtered Pressure Relief Vent Kit 5241200...

Page 17: ...re listed in Chapter 7 Figure 3 4 Glove Installation Connecting the Electrical Supply Source to the Glove Box 115V 60 Hz 100V 50 Hz or 100V 60 Hz Models Connect the power cord supplied to the IEC elec...

Page 18: ...a tube support insert See Figure 3 5 A and B for both methods Consult Figure 3 8 which depicts typical tubing connections with the accessory Automatic Pressure Controller Vacuum pump model numbers can...

Page 19: ...ure 3 5 Close up View of Typical Valve Connection Options Alternative Method with Hose Connector Primary Method for Tygon Tubing Hose Connector Small Ferrule Compression Nut Compression Nut Small Ferr...

Page 20: ...Chapter 3 Getting Started Product Service 1 800 522 7658 16 Figure 3 6 Typical Tubing Connections for Manual Valve Operation Tubing Connection Kit 5245100 provides full details...

Page 21: ...Chapter 3 Getting Started Product Service 1 800 522 7658 17 Figure 3 7 Typical Tubing Connections with Automatic Pressure Controller Tubing Connection Kit 5245200 provides full details...

Page 22: ...pter 3 Getting Started Product Service 1 800 522 7658 18 Figure 3 8 Typical Connections Shown with Connection to the Automatic Pressure Controller Full details provided with Automatic Pressure Control...

Page 23: ...etting Started Product Service 1 800 522 7658 19 Figure 3 9 Typical Tubing Connections for Oxygen Moisture Removal Shown with the Automatic Pressure Controller Tubing Connection Kit 5242501 provides f...

Page 24: ...greater than 1 x 10 4 cc sec while at a positive pressure of 5 inches helium Refer to Chapter 6 Initial Certification and Appendix G for Helium Leak Test Method Overall Glove Box Main Chamber Leak Te...

Page 25: ...required testing instruments for all applications shall be determined by the end user and Safety Officer Other validation test methods such as pressure leak decay tests may be conducted per ISO 10648...

Page 26: ...authorities Oxygen Method Leak Testing Summary ISO 10648 2 The method consists of measuring the increase in the oxygen concentration as a function of time inside the glove box main chamber previously...

Page 27: ...adjustments for barometric pressure and temperature changes which can be calculated as Tf Tf 60 t PnT1 P1Tn 1 where t is the duration of the test in minutes P1 is the absolute pressure ambient baromet...

Page 28: ...procedures The Precise Basic Glove Box allows the end user to customize the glove box or use the glove box in its simplest form See Figure 4 1 to refer to a detailed description of the Precise Contro...

Page 29: ...reads from 5 to 5 inches of water pressure Note The Main Chamber Pressure Gauge is included on Precise Controlled Atmosphere Glove Boxes and can be ordered from Chapter 7 for modification of Precise B...

Page 30: ...ave space IMPORTANT The transfer chamber must have an optional High Vacuum Sleeve if the chamber is converted for vacuum operation on Precise Basic Glove Boxes See Chapter 7 13 Pressure Relief Valve p...

Page 31: ...cals 5 The use of flammable gases or solvents in the glove box should be limited Care must be taken to ensure against the concentration buildup of flammable or explosive gases or vapors Use of an open...

Page 32: ...officer Venting or filtering of vacuum pump exhaust is the operator s responsibility 14 Ensure that the glove box is connected to electrical service in accordance with local and national electrical c...

Page 33: ...beginning work Work from a written plan Arrange for minimal disruptions while the glove box is in use Consult your Safety Officer for personal protective equipment recommendations and operating pressu...

Page 34: ...oxygen levels when the glove box is not in use Maintaining a slight main chamber positive pressure can help to preserve the glove box atmosphere The moisture oxygen permeation rates are reduced at sli...

Page 35: ...controlled atmosphere leave the glove box main chamber under slightly positive pressure and continuously run the recirculating drying train The use of the accessory external glove port caps can assist...

Page 36: ...nfectant or cleaner depending upon the application Using an appropriate cleaner and cloth clean the exterior surfaces of the glove box particularly the front and top to remove any accumulated dust Cha...

Page 37: ...Glove Box in Chapter 3 Oxygen Method Leak Test per ISO 10648 2 test methods Pressure Change Leak Test per ISO 10648 2 test methods Fluorescent Light Replacement 1 Disconnect the power Refer to Appendi...

Page 38: ...riate protective equipment as determined by your Safety Officer 3 Turn the glove box and vacuum pump OFF 4 Remove the valve or pressure gauge by loosening the large nut for the valve or hardware for t...

Page 39: ...ve an adjustable height range from 33 to 40 838mm 1 016mm and include a lower shelf for supporting accessory equipment 4 Anti Static Ionizer Fan Part 5234400 100 115V or Part 5234401 230V Internationa...

Page 40: ...400 European Power Strip 250V 4 Position 2A 5332600 Australian Power Strip 250V 6 Position 2A 5211501 Installation Tool 9 Electrical 9 Pin Sealed Pass Through Kit Part 5075619 Includes sealed 9 pin D...

Page 41: ...Relief Vent Kit No Filters Outside 5238500 HEPA Filtered Pressure Relief Vent Kit Room or Outside 5241200 Carbon Filtered Pressure Relief Vent Kit Room or Outside 5230600 Pressure Relief Valve Basic...

Page 42: ...er and transfer chamber The end user can also automate the purge fill cycles up to 199 cycles for each chamber The vacuum and pressure can be automatically regulated between 5 to 5 inches of water gau...

Page 43: ...Kit Includes the FEP tubing and connections required for connecting typical drying train components such as moisture oxygen and other gases Fluorinated ethylene propylene FEP tubing has very low mois...

Page 44: ...s a set of two 20 Acrylic Viewing Window with Frame Part 5236100 Acrylic window 1 2 thick for those users that prefer acrylic over the standard laminated safety glass includes metal frame 21 Guardian...

Page 45: ...s for installation Installing the pressure gauge requires drilling a 0 562 14 3mm diameter hole in the glove box ceiling 27 Vacuum Gauge for the Transfer Chamber Part 5237900 Kit for the transfer cham...

Page 46: ...electrical circuits PROBLEM CAUSE CORRECTIVE ACTION Unit not plugged into outlet Plug unit into appropriate electrical service Circuit breaker s tripped Reset or replace circuit breaker Lamp not inst...

Page 47: ...errule 6D 1ea 1408400 Small Ferrule 6E 1ea 1413602 Stainless Compression Nut 6F 1ea 1413500 Hose Connector Secondary Method 6G order by the foot 1539500 Polyvinyl Chloride Tubing 3 8 OD x 3 16 ID 6H o...

Page 48: ...Appendix A Replacement Parts Product Service 1 800 522 7658 44 Figure A 1 Replacement Parts for Precise Glove Boxes Precise Controlled Atmosphere Glove Box Shown...

Page 49: ...D Di im me en ns si io on ns s See the following dimensions for all the glove boxes Precise Controlled Atmosphere shown All dimensions in inches Figure B 1 Note Six valves pressure relief valve and t...

Page 50: ...o 49 C Maximum relative humidity 80 for temperatures up to 88 F 31 C decreasing linearly to 50 relative humidity at 104 F 40 C Main supply voltage fluctuations not to exceed 10 of the nominal voltage...

Page 51: ...l R Re ed du uc ct ti io on n R Ra at te es s Oxygen Level Per Number of Purge and Fill Cycles 54 3 2 45 4 4 40 5 2 35 6 2 30 7 4 25 8 8 20 10 5 15 12 6 10 15 1 5 18 1 1 20 3 125 0 6 105 0 8 88 1 2 78...

Page 52: ...l Per Number of Purge and Fill Cycles 78 0 7 70 1 3 54 2 8 42 5 35 6 2 30 7 5 25 9 1 20 11 15 13 2 10 15 8 5 19 1 22 1 0 5 10 15 20 25 0 10 20 30 40 50 60 70 80 90 of Purge and Fill Cycles 5 to 5 Inch...

Page 53: ...ain Chamber Pressure Moisture Leak Rate Initial Moisture Moisture Column Life Life Capacity Weight Capacity of Columns inches of water ppm min ppm 24 hour days ppm grams of moisture 1 2 9 10000 3318 1...

Page 54: ...2 7658 50 Moisture Oxygen Leak Rate 1 0 1 Box Pressure 0 50 100 150 200 250 300 350 400 0 10 20 30 40 50 60 70 80 Time Minutes ppm Moisture Oxygen Moisture 1 2 9 ppm min Moisture 0 1 7 ppm min Moistur...

Page 55: ...http www descoemit com ViewProduct aspx pid 50661 h 1323 was installed in the glove box The DESCO ionizer is a dual steady state DC auto balancing bench top ionizer The ionizer helps to neutralize st...

Page 56: ...e balance adjustment for the ionizer can be accomplished by inserting a small screwdriver or trimmer adjustment tool into the balance adjustment hole located on the side of the unit To increase the ou...

Page 57: ...t valve and allow box to pressurize to 5 H2O gauge than close valve Then with the vacuum pump running open the test outlet valve and allow the box to be evacuated to 5 H2O gauge then close valve Repea...

Page 58: ...10 w g Record data Check that valve reseals within 2 w g of opening pressure and opening vacuum Pressure relief valve is standard on Precise Controlled Atmosphere Glove Boxes Other Equipment 1 For a...

Page 59: ...Product Service 1 800 522 7658 55 A Ap pp pe en nd di ix x H H P Pl lu um mb bi in ng g D Di ia ag gr ra am ms s...

Page 60: ...Appendix H Plumbing Diagrams Product Service 1 800 522 7658 56...

Page 61: ...760 29 92 406 8 33 90 1 14 70 1 033 101 3 1 013 lb in 2 51 71 2 036 27 69 2 307 06805 1 07031 6 895 0689 Kg cm2 735 6 28 96 393 7 32 81 9678 14 22 1 98 05 981 kPa 7 500 2953 4 016 3347 00987 1451 0102...

Page 62: ...trol Pharmaceutical Press 2004 Editors Midcalf Phillips Neiger and Coles Isolation Technology A Practical Guide 2004 CRC Press 2nd Edition www crcpress com International Standard ISO 10648 2 Containme...

Page 63: ...e Glove Boxes 5220000 Series Precise Basic Glove Box 5220100 Series Precise Controlled Atmosphere Glove Box 5220200 Series Precise HEPA Filtered Glove Box 5220300 Series XPert Weigh Box Serial No Vari...

Reviews: