background image

Page 5

NeoTherm Boilers and Water Heaters

SHUTTING DOWN THE NEOTHERM

It may sometimes be necessary to shut down the NeoTherm. Here are the steps required to 
do this:

1.  Switch off the main electrical disconnect switch.

2.  Open the front cover and close the main manual gas valve.

3.  If freezing is anticipated, drain the NeoTherm.  (Also be sure to protect the piping in 

the building from freezing.)

The steps listed above may require qualified service personnel.

RESTARTING THE NEOTHERM

It may be necessary to restart the NeoTherm – for example, after a power interruption.  
Here are the steps required to do this:

1  Reset any errors using the Touchscreen Display.  See the section on “About Lockouts, 

Holds, and Alerts.”

2  Turn up the thermostat to call for heat.

3.  In approximately 2 seconds, the blower will operate.  Ignition should occur after 35-40 

seconds. It may take as long as 2-1/2 minutes.

4.  If ignition does not occur, wait 5 minutes and then repeat steps 1 through 3.

5.  If, after three attempts, the unit still does not light, shut down the boiler and call your 

service technician.

If the unit has been drained, follow these steps:

1.  See the “Installation and Operation Manual” for instructions on filling and purging the 

unit.

2.  Remove the front door. Turn on the gas shutoff valve.

3.  Switch on the main electrical disconnect switch. The pump and blower will start, and 

the igniter will be energized.  After 35 seconds the gas valve will be energized, and 
ignition will occur. If ignition does not occur within 2-1/2 minutes switch “off” the 
main disconnect switch, wait 5 minutes and switch it “on” again. If after three attempts 
ignition does not occur, shut down the unit and call for service.

IN THE EVENT OF POWER FAILURE

The NeoTherm will not operate during an electrical power outage. If there is an extended 
power outage with danger of freezing, then the NeoTherm (and all other water systems) 
should be completely drained.   Before draining the unit, turn off the gas and turn off the 
main power switch. When you replace the unit in service, refer to the “Installation and 

Operation Manual” for instructions on filling and purging.

Summary of Contents for NTV

Page 1: ...ases which could cause serious injury property damage or death Improper installation and or operation will void the warranty AVERTISSEMENT Assurez vous de bien suivres les instructions donn es dans ce...

Page 2: ...Restarting the NeoTherm 5 In the Event of Power Failure 5 THE USER INTERFACE AND ON OFF SWITCH 6 About Lockouts Holds and Alerts 10 Care Inspection and Service 11 Shown without jacket Internal compone...

Page 3: ...s supplier call the fire department POUR VOTRE S CURIT LISEZ AVANT DE METTRE EN MARCHE AVERTISSEMENT Quiconque ne respecte pas la lettre les instructions dans la pr sente notice risque un d but d ince...

Page 4: ...y information listed above If you don t smell gas go to the next step 8 Slowly turn the manual gas valve to ON The handle on the valve will be parallel to the gas pipe 9 Replace the front panel 10 Tur...

Page 5: ...a prochaine tape 8 Remettez lentement la soupape d arr t de gaz en position ON La poign e sera parall le au tuyau de gaz 9 Replacez le couvercle avant 10 R tablissez l alimentation lectrique l apparei...

Page 6: ...ugh 3 5 If after three attempts the unit still does not light shut down the boiler and call your service technician If the unit has been drained follow these steps 1 See the Installation and Operation...

Page 7: ...up While under normal operation the Touch Screen will automatically present this Home screen See Menu 1 Menu 1 Home Screen Menu 2 Status Summary The home screen shows a picture of the NeoTherm control...

Page 8: ...aller level password is lnt lower case LNT User Level no password required Non critical adjustments and functions including adjusting the Central Heat and Domestic Hot Water setpoints monitoring the i...

Page 9: ...e a change For more information on logging in see Section 8 2 2 If you make a change in any group that could affect the safe operation of the unit the control system will ask you to verify the change...

Page 10: ...econds or the veri cation will be cancelled A count down timer is shown at the bottom of the screen 8 4 Checking Individual Parameters 1 From the Home screen Menu 9 press the icon for the controller M...

Page 11: ...1 From the Home Page screen Menu 11 press the icon for the controller Menu 11 Home Page Screen 2 The Status Summary page for that controller will appear See Menu 12 Menu 12 Status Summary Screen 3 Pre...

Page 12: ...ck 1 Start at the Home screen Menu 14 Home screen 2 Press the Setup button on the lower right corner of the screen The system will present the Setup screen Menu 15 Setup Screen 3 Press the Display Set...

Page 13: ...rmation regarding software date codes model numbers and program name as well as giving the installer access to re name the boiler and to change the modbus addresses for lead lag operation 8 7 2 CH Cen...

Page 14: ...h higher priority 8 7 7 Modulation Con guration From this sub menu the installer has the ability to adjust the range of modulation for the CH and DHW demands NeoTherm is designed with a 5 1 turn down...

Page 15: ...he other terminal wired to the pump or a relay controlling the pump Additional 120VAC circuits may be required for the pumps 8 7 9 Statistics Con guration The statistics con guration sub menu allows t...

Page 16: ...duct Support 800 900 9276 Fax 800 559 1583 Headquarters 20 Industrial Way Rochester NH 03867 603 335 6300 Fax 603 335 3355 1869 Sismet Road Mississauga Ontario Canada L4W 1W8 905 238 0100 Fax 905 366...

Reviews: