background image

Newport Oil-Fired Heater

Page 7

Dimensions and Specifi cations

REF

NP 85 - 110

NP 125 - 150

inches

cm

inches

cm

Jacket Height

A

35½

90

41

104

Jacket Width

B

19¼

49

20½

52

Jacket Length

C

20

51

21½

55

Return Tapping Height

D

19½

50

22

56

Supply Tapping

E

33½

85

38

97

Coil Supply Height

F

27½

70

31½

80

Smoke Outlet Diameter

G

6

15

6

15

Burner Center Line

H

22

10½

27

Tankless Coil NPT

--

½

½

Return NPT

--

Supply NPT

--

Shipping Weight - 

lbs

.   

kg

--

310 

141

368

167

Water Content - 

Gallons   

L

--

11.6 

44

15.4

58

Coil Size 

GPM

--

5

--

5

--

Performance

Model

NP 85-110

NP 125 - 150

Firing Rate 

GPH

0.85

--

1.00

--

1.10

--

1.25

--

1.35

--

1.50

--

Input 

MBTU/hr 

   kW

103 

30

120 

35

133

30

150 

44

160 

47

177 

52

Output 

MBTU/hr 

   kW

90 

26

105 

30

116 

34

130 

38

139 

40

154 

48

Effi ciency % AFUE

83.6

83.1

83.1

83.7

83.0

83.0

Net Stack Temperature 

°F 

   

°C

 

312

156

353

178

371

188

351

177

386

197

417

214

Beckett Burner Specifi cations

AFG Burner Purchased to Beckett Spec. #TRI-801 For NP Units

Boiler Model

NP 85 - 110

NP 125 - 150

Burner

AFG

AFG

Nozzle (Factory Installed)

.85 x 70° A

1.25 x 80° A

Nozzle Manufacturer

Delavan

Delavan

Static Plate

3-3/8

3-3/8

Head Type

F3

F6

Pump Pressure

100

100

Carlin Burner Specifi cations

Boiler Model

NP 85 - 110

NP 125 - 150

Burner

EZ - 1

EZ - 1

Nozzle (Factory Installed) 

.70 x 60A

1.00 x 60B

Nozzle Manufacturer

Delavan

Delavan

Head Positioning Bar *

0.6-0.65

0.85-1.00

Pump Pressure - PSI

145

150

* Head Positioning Bar must be changed when changing to an alternate nozzle

OUT OF

PRODUCTION

Summary of Contents for newport

Page 1: ...ich could cause serious injury property damage or death Improper installation and or operation will void the warranty WARNING If the information in this manual is not followed exactly a fire or explos...

Page 2: ...er normally fitted 4 1 10 Installation of Alternate Nozzles for Higher Output 4 1 11 Boiler Controls normally fitted 3 1 12 Oil 3 1 13 Oil Storage and Pipe Layout 3 1 14 Electrical Wiring 4 1 15 Opera...

Page 3: ...gnee 1 3 Boiler Location The boiler should be positioned as near to the chimney as possible and have a minimum smoke pipe connector length of 18 457mm CAUTION Newport boilers must not be directly conn...

Page 4: ...unit Important Refer to burner pump instructions for detailed fuel line and pump usage information All installations must conform to local and national codes See Figures 5A and 5B Figure 5A One pipe...

Page 5: ...tire flue and venting system inspected 1 17 Cleaning the Boiler To maintain the high thermal efficiency and a long life from your boiler it should be cleaned at least once a year preferably at the end...

Page 6: ...be causing a blockage 1 19 Servicing the Burner This should only be carried out by a trained and licensed service technician in accordance with the burner maker s instructions 1 20 Maintenance of the...

Page 7: ...35 133 30 150 44 160 47 177 52 Output MBTU hr kW 90 26 105 30 116 34 130 38 139 40 154 48 Efficiency AFUE 83 6 83 1 83 1 83 7 83 0 83 0 Net Stack Temperature F C 312 156 353 178 371 188 351 177 386 1...

Page 8: ...front panel 3 with screws 2 Slide assembled jacket over boiler and secure side panels to base tray 3 Fix rear panel 4 to sides 4 Adjust corner brackets 5 on heat exchanger so they touch inside of jack...

Page 9: ...rmation Air vent Fill pipe Valve Figure 5A 1 min Oil tank H Filter P Burner Boiler Air vent 1 min Fill pipe Oil tank Figure 5B Valve Filter Burner Boiler H PIPE LENGTHS H One Pipe Gravity System 3 8 O...

Page 10: ...verload protection as required 24V Room Thermostat 1K L1 Hot Power Supply 120V L2 Circulator Switch Low Limit Circulator Hi Limit 1K2 Oil Burner Relay Heating Circulator AQUASTAT RELAY L8124A 1K1 WIRI...

Page 11: ...85 110 Use with P N 51 056 51 090 Flue Cover Assembly 85 110 52 108 Front Panel Assembly 85 110 52 116 Left Panel Assembly 85 110 52 124 Right Panel Assembly 85 110 51 128 Top Panel Assembly 85 110 5...

Page 12: ...Fax 800 559 1583 Customer Service Service Advisors 20 Industrial Way Rochester NH 03867 603 335 6300 Fax 603 335 3355 1869 Sismet Road Mississauga Ontario Canada L4W 1W8 905 238 0100 Fax 905 366 0130...

Reviews: