
REV5
For any questions please contact us at toll free (877) 482-2040 Mon-Fri 8 a.m. to 4:30 p.m. 13
135lb Stainless Steel Spreader Installation
Mount Spreader Cont...
Secure
both
Latches
with a 1/2” Split Shaft Collar.
Align
1
/2” Split Shaft Collar
so it is flush with the outer edge of the Hopper
Latch Rod and
tighten
.
Insert
a
3/8” Bolt
through Hopper Latch, Base and Mounting Plate on both
sides of the Hopper Base.
Set
the
Hopper Cable, Vibrator, Connector and Spinner Motor Connector
off to the side (
Not shown
). These will be connected in the next section.
Tools:
Allen Wrench, 1/8”
G
G
H
I
I