Rigging procedures
Risk of crushing injury
Keep ngers away from underneath the enclosure.
4.
Secure additional SB18 IIi (equipped with rigging plates) on top of the rst one.
Adjusting the gap between stacked enclosures
Place a wedge or a lever between the two enclosures to align the rigging with the inserts.
Be careful not to scratch the paint.
5.
(p.43) until the array is completed.
The last SB18 IIi must be equipped with SB18IIi-ENDLINK.
6.
Tighten all the screws on the array.
Apply a torque of 5 N.m.
5 N.m
7.
Check that all screws are secured and tightened.
What to do next
•
(p.44)
SB18 IIi owner's manual (EN) version 1.0
43