Rigging procedures
Assembly
Procedure
1.
Prepare all SB18 IIi needed for the array.
a) Remove the placeholder screws.
b) Secure SB18IIi-LINK on the enclosures.
Do not secure the bottom screws, except on the last enclosure of the array.
SB18 IIi owner's manual (EN) version 1.0
27