KARA
i
®
MODULAR WST
®
SYSTEM
RIGGING PROCEDURES
VERSION 1.1
KARA
i
_RM_EN_1-1
w w w . l - a c o u s t i c s . c o m
20
4.
Mount four arms to a second SB18i (hereafter designated as SB18i#2) by applying step 2.
5.
Attach SB18i#2 to SB18i#1 as follows:
a.
Position the four SB18i#2 top link holes face to the four SB18i#1 bottom link holes and secure each pair by
driving a 35 mm Torx
®
screw (T30 bit, 5 N.m/45 in.lb
f
).
b.
Fully drive the four remaining Torx
®
screws on each SB18i#1 arm (T30 bit, 5 N.m/45 in.lb
f
).
Figure 14: Attaching SB18i#2 to SB18i#1
a.
SB18i#1
SB18i#2
b.
b.
b.
b.
a.
b.
b.
b.
b.
Summary of Contents for KARAi
Page 1: ...KARAi rigging manual EN ...