Содержание Deep Silence 1 Revision B

Страница 1: ......

Страница 2: ..._________________01 ____________________________________________________________01 ____________________________________________________________02 ______________________________________________________05 ________________________________________________05 ______________________________________________05 ____________________________________06 ___________________________________06 ____________________...

Страница 3: ...Many unique features like the Nanoxia Air Chimney and the revised I O panel are discreetly in tegrated into the linear design In the new revision the Deep Silence 1 again offers the perfect combination of optimal system cooling and lowest possible noise levels Specifications Dimensions 517 x 220 x 532 mm Height x Width x Depth Material Steel plastics External drive bays 2 x 5 25 inch tool free 1 x...

Страница 4: ...he buyer a low noise case while at the same time allow for extremely low system temperatures The noise insulation concept is based on multiple interacting design elements The most important part is the large scale lining of the case with sound absorbing insulati on materials These materials are manufactured specifically to meet the requirements of the developers of the Nanoxia Deep Silence case se...

Страница 5: ...p cover by simply opening the Chimney to allow the heat to escape You can also with the Chimney open mount additional case fans or a water radiator below the cover In this case both the fan and the case interior are optimally protected against dust and spills A circumferential groove in the contact surface of the Air Chimney serves as additional Fans Front 2 x 120 mm Nanoxia Deep Silence fan max 1...

Страница 6: ...ough in order to mount the radiator fan combination at the front of the case Rubber hose guides Four rubber hose guides are located in the rear so that the appropriate water cooling compo nents can be operated or mounted externally Air Chimney One of the main features of the Nanoxia Deep Silence 1 Rev B is without a doubt the Air Chimney design patented The Air Chimney can easily be opened or clos...

Страница 7: ...xtension cable on to your motherboard do not connect it to the power supply yet Next you should mount the CPU cooler for very large CPU coolers the attachment of the EPS extension cable after installation can be difficult In the next step place the motherboard gently inside the case and lead the EPS extension cable through the opening provided in the top left of the mainboard tray Fix the motherbo...

Страница 8: ... this purpose Please remove at first the 5 25 inch cover as described under chapter 2 1 Open the two quick release of the bottom 5 25 inch bay and remove the adapter frame Install the card reader in the frame and then put both the frame and the card reader back into the bay Lock the quick release At the end you can put the included 3 5 inch adapter plate carefully before the card reader 3 Installa...

Страница 9: ...ew the four screws which are holding the rail You can then move rail and cage to a different position on the case bottom 3 1 Mounting of hard disk drives Install the hard drives in the illustrated mounting frames In order to extract the frame squee ze the protruding brackets and pull the slide out gently To install a hard drive into a bracket insert the disk so that the connectors point to the bac...

Страница 10: ...hind the front fans To remove the upper HDD cage first remove the left side panel as seen from the front as well as the two thumb screws that secure the cage Then you can carefully pull it out If you want to remove the lower hard drive cage in order to install a water cooling radiator simply loosen the 8 screws holding the cage to the chassis First remove the front panel see chapter 4 1 Next loose...

Страница 11: ...nch mounting screws long Then push the frame with the hard drives into the HDD cage in the position you prefer If you plan to put the frame in the additional 3 bay HDD cage we recommend connecting the SATA power and data cables before pushing the mounting frame back into the cage and then guide the cables through the appropriate cable guides in the motherboard tray We recommend using SATA data and...

Страница 12: ... proceed carefully so as not to damage the cable of the I O panel 5 Fan assembly One 140 mm and two 120 mm fans are pre installed in your case You can mount up to seven fans in total We recommend the use of the 120 or 140 mm Nanoxia Deep Silence fans available separately These are technically and visually equivalent to the factory installed case fans and will work in perfect harmony with the built...

Страница 13: ...se note that the filter elements must be fully inserted to guarantee the proper operation of the Easy Access Panel 5 2 Fans under the top cover If you want to install more fans at the top of the case please remove the plastic cover first see chapter 4 2 Then hold the fan from the inside and secure it to the top by fastening the screws from the outside Case fans installed at the top of the case sho...

Страница 14: ... should be mounted so that cooler air is introduced into the case fan rear side facing inwards 5 4 Fan in the side panel If you want to accommodate a fan in the side panel remove the outer cover by loosening the screws on the inside The dust filter can remain in its position Please place the fan on the inside of the side panel above the dust filter and secure it from the outside If you secure the ...

Страница 15: ... has two channels A and B with each channel able to control up to three 3 pin fans therefore a total of six fans can be controlled The fan controller is not designed for the operation of powerful fans Please take this into account in particular when using fans from other manufacturers The maximum power per channel must not exceed 18 watts 6 2 Operation of the fan control The sliders for controllin...

Страница 16: ...t panel and under the top cover 8 1 Installation of a radiator or compact water cooling behind the front For the installation please remove the two modular HDD cages in the front see Chapter 3 3 Open the lower front door and the Easy Access Panels and remove the fans Hold the radiator from the inside and secure it with screws using the corresponding mounting slots Finally reinstall the fans For ma...

Страница 17: ... top cover please use the offset mounting holes as shown in the diagrams below The offset ensures the best possible compatibility with current motherboards Please note that you need to remove the top plastic cover see chapter 4 2 Hold the radiator to the inside of the top cover and fasten it with screws distance radiator mainboard 15 ...

Страница 18: ... you might have a question that can t be answered by this manual please do not hesitate to contact us directly by e mail Likewise we would appreciate your suggestions and comments about our case very much Our staff will respond to all inquiries quickly and professionally Customers from Germany and the European countries can use the following e mail address for support questions spare parts or warr...

Страница 19: ... Nanoxia 2015 ...