![Kyoto Kagaku MW29 Instruction Manual Download Page 5](http://html.mh-extra.com/html/kyoto-kagaku/mw29/mw29_instruction-manual_2017845005.webp)
3
1
Preparation
Checking the Connections
Setting up the Head Manikin
Checking the Connections
1.Take out the head/neck manikin and the base from the
carrying bag. The head/neck and base is assembled at
the time of delivery. Verify that two mini bottles for
trachea and one mini bottle for the esophagus are firmly
attached.
1. Remove the seals on the suction caps under the base.
2. Select the place where to set the head manikin and put it there. Press down the suction cup at
the head side onto the table top. Then turn the two dials at the neck side clockwise to anchor.
○ Table top training.( Prepare a table with smooth surface.)
[
Securing the Head/Neck Manikin
]
3. To disengage, release the suction cup at the head side by lifting up the plate with finger,
and then turn the dials counter clockwise to release remaining suction cups.
*
2
Setting up the Head Manikin
Dirt and dust on the
surface of the suctioning
cups weaken their hold-
ing power.
Clean their surface before
setting-up.