-
31
-
(1) Setting items
Setting items for RAMP measurement are as follows.
(For RAMP measurement, 250V cannot be set at 500V (250V) Range.)
* Speed of voltage rise: Voltage rise per minute.
* Breakdown/ Burn : Either Breakdown or Burn mode is selectable.
(2) Setting procedures
Follow the procedures below.
Output voltage rate can be set between 100V/min and 9000V/min.
[Stand-by state]
ENTER button(
)
Setting of Voltage rise speed (with UP/DOWN button(
))
ENTER button(
)
Setting of Breakdown/Burn (with UP/DOWN button(
))
ENTER button(
)
Setting is finished.
Summary of Contents for KEW 3127
Page 1: ...INSTRUCTION MANUAL HIGH VOLTAGE INSULATION TESTER KEW 3127 ...
Page 49: ... 46 ...
Page 57: ... 54 MEMO ...
Page 58: ... 55 MEMO ...
Page 59: ......