
In the case of continuous rainy weather or serious ash accumulation, on the basis of the
installation of the fuselage long shading brush,
It is recommended to purchase and install a protective cover to protect against raindrops
and dust and extend the normal working time.
3
* The illustrations in this manual are for reference
only. The actual appearance shall prevail.
3. Introduction
Dust cover
Water cube
The battery
4G network module
M4 hexagon socket wrench
Protective cover
The charger
Shoulder straps
M5 inner hexagon wrench
B/C type roller brush support
track
Dust cover for central suction cup
M8 inner hexagon wrench
B/C type roller
Self cleaning pearl cotton
Circlip pliers
5.5-7 open end wrench
Shading brush
Vacuum filter
4 x 100mm phillips screwdriver
8-10 Open end wrench
3.3 Optional accessories
3.4 Roll brush type description
Type
Effective
cleaning width
Applicable PV panel size type
B
1150mm
M2(156mm) G1 (158mm)
M4(162mm) M6(166mm)
M10(182mm)
C
1320mm
G12(210mm)
Model
Kwun-B30M2
Operating system
TianyunOS
Battery
25.2V 15.3Ah
Recharger out
29.4V
⎓
5A
Battery life
≈246min
Charging time
≈180min
Weight
22.2Kg / 24.85Kg(Included battery)
Size
L 650mm * W 560mm * H250mm
3.5 Specification