6
Once you have identified a suitable antenna
mounting site, according to the guidelines
provided on
, follow these steps to drill the
mounting holes and cable access hole to prepare
the site for installation.
a.
Unfold the antenna mounting template
(supplied in the Customer Welcome Kit) and
place it onto the mounting surface. Make sure
the “FWD” (forward) arrow points toward
the bow and is
parallel
to the vessel’s
centerline (see Figure 8). Tape in place.
NOTE:
You don’t need to mount the antenna exactly
on the vessel’s centerline (the closer, the better), but
the antenna’s forward arrow must be
parallel
to it.
b.
Using a light hammer and center punch,
mark the locations for the four mounting
holes and cable access hole on the mounting
surface in the locations indicated on the
template.
c.
Drill a 3/8" (10 mm) hole at the four
mounting hole locations you marked in
Step b. Later, you will insert four 1/4"-20
bolts through these holes to secure the
antenna to the mounting surface.
d.
Cut out the 3" (80 mm) cable access hole in
the location you marked in Step b. Smooth
the edges of the hole to protect the cables.
Later, you will route the RF cable(s) through
this hole and into the vessel.
e.
Clean and dry the antenna mounting surface.
f.
Peel off the paper backing from the supplied
foam seal to expose the adhesive. Then press
the foam seal down firmly onto the mounting
surface, ensuring the hole in the foam seal
aligns with the cable access hole in the
mounting surface (see Figure 8).
NOTE:
Apply the foam seal to the vessel mounting
surface, not to the antenna’s baseplate. You will have
difficulty connecting the cable(s) to the antenna if the
foam seal is attached to the baseplate.
9"
(229 mm)
Ø 3/8" (Ø 10 mm)
Mounting Hole (x4)
Ø 3" (Ø 80 mm)
Cable Access Hole
FWD
Align Foam Seal
with Cable
Access Hole
9"
(229 mm)
Figure 8: Antenna Mounting Holes Layout
Prepare the Antenna Site
4
Summary of Contents for TracVision TV5
Page 1: ...KVH Industries Inc Installation Guide TracVision TV5 ...
Page 45: ......