16
Follow the steps below to wire the antenna(s)
and attach the antenna’s foam seal.
a.
Clean and dry the bottom of the antenna
baseplate (see Figure 19).
b.
Peel off the paper backing from one of the
supplied foam seals to expose the adhesive.
Align the foam seal so it is centered on the
antenna (see Figure 19). Then press the foam
seal firmly onto the underside of the antenna.
c.
Connect the power/data cable to the
antenna’s power/data connector (see
Figure 20). Hand-tighten until the connector
locks in place; do not use excessive force.
d.
Fill half of the inner body of the “18V,””13V,”
“18V/22KHz,” and “13V/22KHz” cables’
connectors with the supplied silicone grease
to prevent moisture and corrosion (see
Figure 20).
e.
Connect and slowly hand-tighten the RF
cables to the corresponding antenna
connectors, allowing the grease to diffuse and
settle into the entire space within the
f.
Using a 7/16" open-end torque wrench set to
20 in-lbs (2.25 N-m), tighten each of the RF
cable connections.
g.
Using silicone sealant (or equivalent), create a
weather-tight seal over each antenna
connection.
h.
Using a #1 Phillips screwdriver, install the
cable cover (supplied in the kitpack) onto the
antenna and secure in place with the six #6-32
captive screws and washers (see Figure 21).
i.
If you are installing two antennas, repeat
these steps to wire the second antenna.
Refer to the cable and connector labels to
ensure the antenna is wired exactly as shown
in Figure 20.
IMPORTANT!
Wire the Antenna(s)
Figure 19 Foam Seal
Figure 20 Cable Connections
Figure 21 Cable Cover/Screws/Washers
Foam Seal
Antenna Baseplate (Bottom View)
13V/22KHz
18V/22KHz
Power/Data
13V
18V
Foam Seals
Mounting
Surface
Baseplate
13V/
22KHz
18V/
22KHz
Power/
Data
18V
13V
13V/22KHz
18V/22KHz
Power/Data
13V
18V
Label
Label
Label
Label
Label
#6-32 Captive Screw
and Washer (x6)
Cable
Cover
8
Summary of Contents for TracVision HD11
Page 1: ...TracVision HD11 Installation Guide ...
Page 4: ......