40
40
Track marker
Setting the marker disc
Heavy soils:
Disc angled, set the inclination
angle as desired
Light soil:
Disc vertical, set no or only
small inclination angle
Set the working width
For the Track markers from the
coulter to the marker disc
Row spacing
75 cm
Working width
600,0 cm
Row s Working width
2
75 + 600 =
337,5
2
Summary of Contents for Optima TFprofi ll
Page 1: ...Manual to setup precision drill Optima TFprofi ll in the filed 1 Assembly after transport ...
Page 2: ...2 2 Technical data ...
Page 3: ...3 3 Technical data ...
Page 4: ...4 4 For your safety ...
Page 5: ...5 5 Tightening torques ...
Page 6: ...6 6 Frame ...
Page 7: ...7 7 Rows Standard Row HD Row ...
Page 8: ...8 8 Rows HD 2 Row SX Row ...
Page 9: ...9 9 Mikrogranulat ...
Page 10: ...10 10 Delivery and assembly fixing points for crane loading ...
Page 11: ...11 11 Delivery and assembly fixing points for forklift ...
Page 12: ...12 12 Delivery and assembly remove fixing of drawbar ...
Page 13: ...13 13 Delivery and assembly pull hydraulic hoses through the drawbar ...
Page 15: ...15 15 Delivery and assembly remove the transport ring ...
Page 17: ...17 17 Delivery and assembly assemble the loading platform ...
Page 18: ...18 18 Delivery and assembly assemble bracket for tool box ...
Page 19: ...19 19 Delivery and assembly adjust track marker ...
Page 20: ...20 20 Delivery and assembly removed parts ...
Page 21: ...21 21 Comments ...
Page 22: ...22 22 Comments ...
Page 24: ...24 24 Mechanical coupling ...
Page 26: ...26 26 Hydraulic connections ...
Page 28: ...28 28 Option 01 non ISOBUS tractor ...
Page 29: ...29 29 Option 01 non ISOBUS tractor ...
Page 30: ...30 30 Option 01 non ISOBUS tractor ...
Page 31: ...31 31 Option 02 ISOBUS tractor ...
Page 36: ...36 36 Comments ...
Page 37: ...37 37 Comments ...
Page 39: ...39 39 Frame adjustment parallel to the ground ...
Page 44: ...44 44 Deliverable seed discs Optima more seed discs available ...
Page 49: ...49 49 Adjustment airflow over pressure only SX negative pressure ...
Page 51: ...51 51 Fertilizer ...
Page 52: ...52 52 Comments ...
Page 53: ...53 53 Comments ...
Page 58: ...58 58 Stepless gear box 8 x 10 m ...
Page 59: ...59 59 Stepless gear box 8 x 10 m ...
Page 60: ...60 60 Calibration test of fertilizer ...
Page 61: ...61 61 Calibration test of fertilizer ...
Page 62: ...62 62 Calibration test of fertilizer ...
Page 64: ...64 64 Calibration test granule ...
Page 65: ...65 65 Calibration test granule ...
Page 76: ...76 76 Screen overview ...
Page 80: ...80 80 Finishing the field Field was successfully recorded Field was successfully recorded ...
Page 84: ...84 84 Section control ...
Page 85: ...85 85 Section control ...
Page 86: ...86 86 Section control ...
Page 87: ...87 87 Comments ...
Page 88: ...6 Trouble shooting Manual to setup precision drill Optima TFprofi ll in the filed ...
Page 98: ...7 Technical Service Manual Manual to setup precision drill Optima TFprofi ll in the filed ...
Page 107: ...107 107 Main box Master PCB schematics ...
Page 108: ...108 108 Main box Slave PCB schematics ...
Page 109: ...109 109 Main box Master PCB schematics ...
Page 130: ...130 130 Control box Visus cable to monitor ...
Page 135: ...135 135 Software update 2 Start the IsoMatch TopService tool ...
Page 137: ...137 137 Hydraulic connections ...
Page 138: ...138 138 Hydraulic schematics working wheels and hydraulic drive for fertilizer ...
Page 140: ...140 140 Hydraulic schematics working wheels and mechanical drive for fertilizer ...
Page 142: ...142 142 Hydraulic schematics working wheels and mechanical drive for fertilizer ...
Page 143: ...143 143 Hydraulics ground following system ...
Page 147: ...147 147 Overview of alarms e drive II 1 05 software ...
Page 148: ...148 148 Overview of alarms e drive II 1 05 software ...
Page 149: ...149 149 Overview of alarms e drive II 1 05 software ...
Page 150: ...150 150 Overview of alarms e drive II 1 05 software ...