Initial Powering Operations for the Machine Line
KVAL Operation Manual
3-4
Initial Powering Operations for the Machine Line
This section describes how to power up and to power down the Machine Line.
Powering up the system includes:
• Applying power to the entire system
• Starting the Control Circuit
Powering down the system includes:
• Shutting down the control power
• Removing power from the entire system
Operator’s Station
Controls are located at the Operator’s station.
Touch Screen Interface:
Main Control of
Entire Machine Line. Download G-code and
Templates to set the specifications of door
machining. Manually control the door path
and process through the line. Machine diag-
nostics are included, as well as internet sup-
port and connectivity for remote support via
our Service Support.
Touch Screen Interface:
Main Control of
Entire Machine Line. Download G-code and
Templates to set the specifications of door
machining. Manually control the door path
and process through the line. Machine diag-
nostics are included, as well as internet sup-
port and connectivity for remote support via
our Service Support.
Main Control Panel:
Power -Up and Power
Down machines. Start and stop the door pro-
cess, pause doors in the Feeder and Stacker.
Emergency Stop.
See “Initial Powering Operations for the
Keyboard:
Enter data and interact with
Touch Screen.
Summary of Contents for DL-NCD
Page 10: ...KVAL DL NCD Operation Manual Table of Contents ...
Page 28: ...How to Download the Service Application KVAL Operation Manual 1 18 ...
Page 30: ...Safety Sign Off Sheet KVAL Operation Manual 1 20 ...
Page 62: ...About the LiteCutout Feature Detail KVAL Operation Manual 2 32 ...
Page 94: ...Appendix About Backing up the Data KVAL Operation Manual 3 32 ...
Page 118: ...Appendix Servo Motor Drive Assembly Locations KVAL Operation Manual 4 24 ...
Page 139: ...About the Electrical Panels KVAL Operation Manual 5 21 I ...
Page 142: ......
Page 143: ......