![Kval 965X Service Manual Download Page 58](http://html.mh-extra.com/html/kval/965x/965x_service-manual_2012797058.webp)
Remove and Replace the Router or Pre-Drill Bits
3-28
965X Service Manual
3.
Lightly attach collet assembly on drill.
4.
Insert the new bit into the assembly.
5.
Before tightening the collet assembly, adjust the bit depth. Set the router bit to
1 3/4 “and the drill bit to 2.0” from the base of the collet nut to the tip of the bit.
Note:
If available and suits the parameters of the tool length , use Bit Depth Gauge (PN
432 C) to set the depth. See
Figure 3- 23 .
FIGURE 3- 23.
Using the Bit GaugesFigure 3- 23
6.
Lightly tighten and torque to correct value. For torque values,
See “Collet Torque
Values” on page 3-34
7.
Before starting the cutting process, check the Tool Configuration screen at the inter
-
face.
See “Check or Update Tool Configuration” on page 3-29
Drill Depth
Set to 2.0”
Router Depth
Set to 1 3/4 “
1 3/4 ““
2.0 “
Bit Depth
Gauge
(PN432C)