Version 1 / 2021
Kurth Electronic, All Rights Reserved.
Page 11
xDSL connection setup (autotest)
xDSL connection setup
(autotest)
Ready
Ready
– Tester is ready
for a connection setup.
G.Handshake
G.Handshake
– G.hs
signal from the DSLAM
recieved at the far end.
Full Initialization
Full Initialization
–
Information exchange
and training phase.
Showtime
Showtime
– active
connection/synchroni-
zation. The connection
between the DSLAM
and the test device has
been successfully esta-
blished.