V3.3 11.07.2007 KRC-AD-KRC2ed05-BA en
5. Planning
Overview
* The N-conductor is only necessary for the service socket option with a 400 V
power supply.
5.5.1
Power supply connection via X1 Harting connector
Description
A Harting connector bypack (1) is supplied with the robot controller. The cus-
tomer can use this to establish a connection between X1 (2) on the robot con-
troller and the power supply.
5.5.2
Power supply connection via CEE connector XS1
Description
With this option, the robot controller is connected to the power supply via a
CEE connector (2). The cable is approx. 2.9 m long and is routed to the main
switch via a cable gland (1).
Fig. 5-4: Power supply connection
The robot controller must only be connected to a power system with a clock-
wise rotating field. Only then is the correct direction of rotation of the fan mo-
tors ensured.
Fig. 5-5: Power supply connection X1
Summary of Contents for KR C2 edition05
Page 8: ...8 157 V3 3 11 07 2007 KRC AD KRC2ed05 BA en KR C2 edition05...
Page 72: ...72 157 V3 3 11 07 2007 KRC AD KRC2ed05 BA en KR C2 edition05 Connector pin allocation...
Page 76: ...76 157 V3 3 11 07 2007 KRC AD KRC2ed05 BA en KR C2 edition05...
Page 84: ...84 157 V3 3 11 07 2007 KRC AD KRC2ed05 BA en KR C2 edition05...
Page 157: ...157 157 V3 3 11 07 2007 KRC AD KRC2ed05 BA en...