Putting into service
Disc mower
GMD800GII-FF
29
If measure A is comprised between 2.10 m (6’11")
and 2.25 m (7’04"):
- Place lower links in position b:
Adjust machine lower hitch pin position:
- Loosen the 8 screws (3).
- Centre hitch pin (1) with regards to the mounting plate.
- Tighten 4 hitch pin screws (1).
• Torque : 12 daN m (89 lbf ft).
- Position hitch pin (2) at measure (X = 825 mm (2’8").
- Tighten 4 hitch pin screws (2).
• Torque : 12 daN m (89 lbf ft).
If measure A is comprised between 2.25 m (7’04")
and 2.40 m (7’10"):
- Place lower links in position c:
Adjust machine lower hitch pin position:
- Loosen the 8 screws (3).
- Position hitch pin (2) at measure G = 10 mm (0.4").
- Tighten 4 hitch pin screws (2).
• Torque : 12 daN m (89 lbf ft).
- Position hitch pin (1) at measure (X = 825 mm (2’8").
- Tighten 4 hitch pin screws (1).
Torque : 12 daN m (89 lbf ft).
X
X
G
Summary of Contents for GMD800GII-FF
Page 1: ...KN198KGB D OPERATOR S MANUAL Disc mower GMD800GII FF KN198KGB D English 04 2010...
Page 2: ......
Page 20: ...Disc mower 18 GMD800GII FF Safety...
Page 83: ...Appendix Disc mower GMD800GII FF 81 T Axle loads Tractor only...
Page 85: ...Limited warranty Disc mower GMD800GII FF 83 Limited warranty...
Page 86: ...Disc mower 84 GMD800GII FF Limited warranty...
Page 87: ......
Page 88: ......