Gyrorake
76
GA8121
Maintenance and storage
KN202BGB F
Rotor arm wedging
When the play between the rotor arm and the sheath is
too import, additional wedges may be inserted.
- Unscrew the 4 bolts (1).
- Insert spacers (2):
• Divide the wedging on either sides if possible.
- Tighten the 4 bolts (1).
Tyre pressure
• Transport wheels (1): 3.0 bar (43 psi).
• Rotor wheels (2): 2.0 bar (29 psi).
Additional wedges supplied with the machine.
1
2
2
2
1
2
2
2
2
1