Instructions for work
Gyrorake
GA300G
33
$
Instructions for work
1. Putting the machine into work
position
From the transport position:
- Remove pin (1).
- Move windrow curtain beam (2) to the required
position (3): 4 positions are possible (3).
- Insert and lock pin (1).
- Lower the tractor three-point linkage to rest the
machine on the ground.
The machine is in working position.
Before placing the machine in working
position:
- Check that nobody is within the machine
pivoting area.
- If there is someone, make sure the
person moves away.
The tractor lift linkage must be in floating
position.
When optional equipment is used, follow
specific procedures mentioned in the related
section: ’’Optional equipment’’.
Summary of Contents for GA300G
Page 1: ...KN149BGB A OPERATOR S MANUAL Gyrorake GA300G KN149BGB A English 02 2010...
Page 2: ......
Page 53: ...Appendix Gyrorake GA300G 51 T Axle loads Tractor only...
Page 55: ...Limited warranty Gyrorake GA300G 53 Limited warranty...
Page 56: ...Gyrorake 54 GA300G Limited warranty...
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......