Putting into service
Mower conditioner
FC243
23
Preparing the machine
Linkage adjustment
- Measure dimension A.
If measure A is below 2.10 m (6’11’’):
- Place lower links in position (a).
- Adjust machine lower hitch pin position:
• Unscrew the 8 bolts (3).
• Position hitch pin (1) at measure A = 10 mm (0.4’’).
• Tighten 4 hitch pin screws (1). Torque:
21 daN m (155 lbf ft).
• Position hitch pin (2) at measure B = 825 mm (2’8’’)
• Tighten 4 hitch pin screws (2). Torque:
21 daN m (155 lbf ft).
Summary of Contents for FC243
Page 1: ...OPERATOR S MANUAL Mower conditioner FC243 KN123BGB C English 02 2006...
Page 2: ......
Page 68: ...Mower conditioner 66 FC243 Limited warranty LIMITED WARRANTY...
Page 69: ...Limited warranty Mower conditioner FC243 67...
Page 70: ......
Page 71: ......
Page 72: ......