Rotary cultivators
20
EL32
Putting into service
$
PUTTING INTO SERVICE
1. Coupling and uncoupling
Description of coupling elements
- A PTO shaft 1 3/8’’ - 6 splines.
- A 3-point hitch.
Preparing the tractor
The machine adapts to tractors fitted with a 3 point
linkage category 1.
The tractor nominal PTO speed must be 540 min
-1
.
Hitch pin parallelism
Adjust tractor lift rods so that hitch pins are parallel to the
ground.
Summary of Contents for EL32
Page 1: ...OPERATOR S MANUAL Rotary cultivators EL32 KN100CGB B English 11 2005...
Page 2: ......
Page 45: ...Limited warranty Rotary cultivators EL32 43 LIMITED WARRANTY...
Page 46: ...Rotary cultivators 44 EL32 Limited warranty...
Page 47: ......
Page 48: ......