- 23 -
MACHINE ASSEMBLY
Attach the front end of the conditioning unit to
the hook of the overhead crane by means of
a textile sling.
Remove the frame/conditioning unit connect-
ing bracket (reinstall the two screws on the
conditioner side, they will be used to fix a pro-
tection cover).
Remove the cutting height adjustment rod
pivot pins.
Fit the adjustment rod (included in the non
assembled parts package), reinstall the two
pivot pins and secure with lock screws pro-
vided.
To remove frame/conditioning unit connect-
ing brackets (one on each side of the ma-
chine) proceed as follows :
Loosen both fixation screws.
Lengthen or shorten the cutting height adjust-
ment rod until the connecting brackets are no
longer under load.
Completely unscrew the two screws, remove
and scrap both connection brackets.
For machines palleted without wheels :
Tighten wheel bolts to 10 daNm (74 ft.lbs).
Check tires for correct pressure.