Operation
64
The dozer blade moves as shown in the figure.
Overview of control lever functions
The figure shows, in connection with the following table, the
functions of the left and right control levers.
Control levers
Movement
Right control lever
1
2
3
4
Lower boom
Raise boom
Bucket crowd
Bucket dump
Left control lever
A
B
C
D
Arm dump
Arm crowd
Swivel frame to the left
Swivel frame to the right
Operating the boom
To raise the boom, pull the right control lever back (figure
position ).
To lower the boom, push the right control lever forward
(figure position ).
Watch the boom during lowering, so that the boom
or the bucket teeth do not hit the dozer blade.