SETUP 2
3
2.1
Unpacking and setting up the vehicle
F01344-10
–
Remove the straps and box.
F01003-01
–
Remove the adhesive tape in the upper area of the motorcycle.
F01004-01
–
Roll down the film at the sides.
Info
To avoid damaging the motorcycle during unpacking,
leave the other films on the vehicle until you have fin-
ished work on the vehicle.
–
Remove the separate enclosure and unpack it. Check the sepa-
rate enclosure for completeness.
–
Check the vehicle for transport damage.
F01005-01
–
Remove the controls from the transport holder.
–
Remove the screws and handlebar clamps.
–
Remove the transport holder.
F00995-01
–
Remove the right hand guard.
–
Position the controls on the right half of the handlebar.
Tighten the screws.
Guideline
Remaining screws,
chassis
M5
5 Nm (3.7 lbf ft)
Remaining chassis
screws
M6
10 Nm (7.4 lbf ft)
–
Mount the right hand guard.