6
FORK, TRIPLE CLAMP
35
6.12.13 Adjusting the play of the steering head bearing
Preparatory work
–
Raise the motorcycle with the lift stand. (
M00099-10
Main work
(EXC
‑
F EU/AUS/BR, XCF
‑
W)
–
Loosen screws
and
.
–
Loosen and retighten screw
.
Guideline
Screw, top steering head
M20x1.5
12 Nm
(8.9 lbf ft)
–
Using a plastic hammer, tap lightly on the upper triple clamp to avoid strains.
–
Tighten screws
.
Guideline
Screw, top triple clamp
M8
20 Nm
(14.8 lbf ft)
–
Tighten screw
.
Guideline
Screw, top steering stem
M8
20 Nm
(14.8 lbf ft)
M00174-10
(EXC-F US)
–
Loosen screws
and
.
–
Loosen and retighten screw
.
Guideline
Screw, top steering head
M20x1.5
12 Nm
(8.9 lbf ft)
–
Using a plastic hammer, tap lightly on the upper triple clamp to avoid strains.
–
Tighten screws
.
Guideline
Screw, top triple clamp
M8
20 Nm
(14.8 lbf ft)
–
Tighten screw
.
Guideline
Screw, top steering stem
M8
20 Nm
(14.8 lbf ft)
Finishing work
–
Check the steering head bearing play. (
–
Remove the motorcycle from the lift stand. (
6.13
All SIX DAYS models
6.13.1
Performing a fork service
Condition
The fork legs have been removed.
Summary of Contents for 350 EXC-F SIX DAYS EU
Page 2: ......
Page 235: ...233 ...