SERVICE WORK ON THE CHASSIS
43
–
Press the dust boots back into their normal position.
–
Remove excess oil.
–
Position the fork protection. (
–
Remove the motorcycle from the lift stand. (
10.5
Loosening the fork protector
101321-10
–
Remove screws
and remove the clamp.
–
Remove screws
on the left fork leg. Push the fork protector downwards.
–
Remove the screws on the right fork leg. Push the fork protector downwards.
10.6
Positioning the fork protection
101321-11
–
Position the fork protection on the left fork leg. Mount and tighten screws
.
Guideline
Remaining screws, chassis
M6
10 Nm (7.4 lbf ft)
–
Position the wiring harness.
–
Position the brake line. Put the clamp on, mount and tighten screws
.
–
Position the fork protection on the right fork leg. Mount and tighten the screws.
Guideline
Remaining screws, chassis
M6
10 Nm (7.4 lbf ft)
10.7
Removing the fork legs
–
Remove the headlight mask with the headlight. (
–
Remove the front wheel.
101322-10
–
Remove screws
and take off the clamp.
–
Remove cable binder
.
–
Remove screws
and take off the brake caliper.
–
Allow the brake caliper and brake line to hang tension-free to the side.
101323-10
(XCF
‑
W, EXC
‑
F EU, EXC
‑
F AUS)
–
Unscrew screws
. Take out the left fork leg.
–
Loosen screws
. Take out the right fork leg.
101324-10
(EXC-F SIX DAYS)
–
Release screws
. Take out the left fork leg.
–
Release screws
. Take out the right fork leg.
Summary of Contents for 2012 350 EXC-F SIX DAYS
Page 2: ......