5 Installation at Site
26 of 72
Sewatec (60 Hz)
8B
1M.1
1M.2/6D
13B
13D
1M.1
6B
6B
3M
Fig. 6:
Auxiliary connections
Table 14:
Sizes of auxiliary connections
Connection
Description
Size
050 - 215
050 - 216
050 - 250
050 - 251
065 - 215
065 - 216
065 - 217
065 - 250
K 065 - 252
065 - 253
080 - 215
080 - 216
080 - 217
080 - 250
080 - 252
080 - 253
080 - 315
080 - 316
080 - 317
100 - 250
100 - 251
F 100 - 252
F 100 - 253
100 - 254
100 - 255
100 - 315
100 - 316
100 - 317
150 - 251
125 - 315
125 - 317
150 - 315
150 - 317
200 - 315
200 - 316
200 - 317
200 - 318
100 - 401
K 100 - 400
K 150 - 400
150 - 401
150 - 403
151 - 403
200 - 401
K 200 - 402
200 - 403
200 - 330
250 - 400
250 - 401
250 - 403
300 - 400
300 - 401
1M.1
Pressure gage
G 1/2
1M.2
5)
Pressure gage
-
G 1/2
6D
Vent
G 1/2
G 3/4
G 1
G 1 1/4
3M
Pressure/vacuum gage
G 1/2
6B
Casing drain
G 1/2
G 1
8B
Leakage check
G 3/8
13D
Lubricant filler
opening
G 1/2
13B
Lubricant
drain
G 3/8
5.6 Checking the coupling alignment
DANGER
Inadmissible temperatures at the coupling or bearings due to misalignment
Explosion hazard!
▷
Make sure that the coupling is correctly aligned at all times.
5)
For vertical installation only