LCV [en-US]
3
Contents
Section
Page
Section
Page
1
General
5
2
Safety
6
2.1
Safety Markings
6
2.2
Personnel Qualification and Training
6
2.3
Non-compliance with Safety Instructions
7
2.4
Safety Awareness
7
2.5
Safety Instructions for Operators
7
2.6
Safety Instructions for Maintenance, Inspection &
Installation
7
2.7
Unauthorized Modification and Manufacture of Spare Parts 7
2.8
Unauthorized Modes of Operation
7
2.9
Assembly & Disassembly Safety
7
3
Transport and Storage
9
3.1
Transport & Handling Safety
9
3.2
Storage Requirements
9
3.2.1
Storage of New Pumps - Pumps under Warranty
9
3.2.2
Pump Storage
9
3.2.3
Pump Parts Storage
10
3.2.4
Removal from Storage
11
3.3
Recommended Lifting
12
4
Description
13
4.1
Technical Specification
13
4.2
Designation
13
4.3
Design Features
13
4.4
Noise Characteristics
14
4.5
Accessories
14
4.6
Dimensions and Weights
14
4.7
Forces and Moments at Nozzles
14
5
Installation at Site
15
5.1
Safety Regulations
15
5.2
Foundation
15
5.3
Installing the Baseplate and Pump
15
5.3.1
Aligning the Pump / Drive Train for Horizontal Pump
Application
15
5.3.2
Place of Installation
16
5.4
Connecting the Piping
16
5.4.1
Auxiliary Connections
16
5.5
Safety Guards
17
5.6
Oil Temperature Monitoring
17
5.7
Final Check
17
5.8
Connection to Power Supply
17
6
Commissioning / Operation
18
6.1
Commissioning / Return to Service
18
6.1.1
Bearing Lubrication
19
6.1.2
Shaft Seal Commissioning
19
6.1.3
Checking the Direction of Rotation
19
6.1.4
Cleaning the Plant Piping
19
6.1.5
Suction Strainer
19
6.2
Start-up
20
6.2.1
Priming the Pump
20
6.3
Shutdown
21
6.3.1
Measures to be taken for Prolonged Shutdown
21
6.4
Operating Limits
21
6.4.1
Temperature Limits
21
6.4.2
Switching Frequency
22
6.4.3
Density of the Medium Handled
22
6.4.4
ZW Pump Additional Limits
22
7
Maintenance
23
7.1
Supervision of Operation
23
7.2
Drainage / Disposal
23
7.3
Lubrication and Lubricant Change
23
7.4
Procedures for Maximum Parts Life
24
7.5
Operational Problems and Solutions
24
8
Mechanical End
26
8.1
Mechanical End Overview
26
8.2
Mechanical End Disassembly
27
8.3
Mechanical End Assembly
27
8.3.1
Mounting the Bearings
28
8.3.2
Back to Back Thrust Bearing Installation
28
8.3.3
Face to Face Thrust Bearing Installation
29
8.3.4
Installing End Covers and Seals
30
8.4
Bearing Assembly Mounting
30
9
Shaft Seal
31
9.1
Seal Plate
31
9.1.1
Seal Plate Assembly (LCV Only)
31
10
Wet End
32
10.1
Wet End Overview
32
10.2
Wet End Disassembly
32
10.2.1
Impeller Removal
32
10.2.2
Impeller Break-Loose Device
32
10.2.3
Impeller Removal with Impeller Lifting Device
33
10.2.4
Casing Removal
33
10.3
Wet End Assembly
33
10.3.1
Mounting the Shaft Sleeve
33
10.3.2
Mounting the Casing
33
10.3.3
Impeller Installation
34
10.4
Setting the Nose Gap
34
10.4.1
Nose Gap Adjustment (Frame Size 1 & 2)
34
10.4.2
Nose Gap Adjustment (Frame Size 3 & 4)
35
11
Tooling
36
11.1
Torque Requirements
36
11.2
Spare Parts Stock
37
12
Troubleshooting
38
14
Notes
40
Summary of Contents for LCV
Page 40: ...LCV en US 40 14 Notes ...