7 Servicing/Maintenance
27 of 40
Emporia MB
NOTE
After commissioning, increased temperatures may occur at grease-lubricated rolling
element bearings due to the running-in process. The final bearing temperature is
only reached after a certain period of operation (up to 48 hours depending on the
conditions).
7.3 Drainage/cleaning
WARNING
Fluids, consumables and supplies which are hot and/or pose a health hazard
Hazard to persons and the environment!
▷
Collect and properly dispose of flushing fluid and any residues of the fluid
handled.
▷
Wear safety clothing and a protective mask if required.
▷
Observe all legal regulations on the disposal of fluids posing a health hazard.
1.
Use the suction nozzle or discharge nozzle to drain the fluid handled.
2.
Always flush the system if it has been used for handling noxious, explosive, hot
or other hazardous fluids.
Always flush and clean the pump before transporting it to the workshop.
Provide a certificate of decontamination for the pump.
(
ð
Section 12, Page 36)
7.4 Dismantling the pump set
7.4.1 General information/Safety regulations
DANGER
Insufficient preparation of work on the pump (set)
Risk of injury!
▷
Properly shut down the pump set.
▷
Close the shut-off elements in suction and discharge line.
▷
Drain the pump and release the pump pressure.
▷
Close any auxiliary connections.
▷
Allow the pump set to cool down to ambient temperature.
WARNING
Unqualified personnel performing work on the pump (set)
Risk of injury!
▷
Always have repair and maintenance work performed by specially trained,
qualified personnel.
WARNING
Hot surface
Risk of injury!
▷
Allow the pump set to cool down to ambient temperature.
Summary of Contents for Emporia MB
Page 1: ...Multistage Horizontal Centrifugal Pump Emporia MB Installation Operating Manual...
Page 38: ......
Page 39: ......