FIBREGLASS WETWELL INSTALLATION
Wetwell Installation Checklist
including Lift Stations, Vertical Pump Vaults, and Basins
Complete this checklist and keep it with copies of any written authorizations for variations and/or deviations received from GA.
Site Owner____________________________________________Installation Date__________________
Wetwell Unit Serial Number_______________________________
Site Address:
Street__________________________________City_______________________State_________Postcode_________
Installing Contractor______________________________Company_________________________________________
Street__________________________________City_______________________State_________Postcode__________
Fibreglass Wetwell
Completed
N/A
1. Wetwell inspected for damage prior to installation as described in Section A.
_________
_________
2. Installation method used for Bottom Slab:
_________
_________
Closed Fibreglass Bottom with external structural anchors (Section D3):
□ Cast in place slab
3. Bottom Slab design according to:
(select only one)
□ As per drawing
□ CertifiedEngineer for the specific jobsite
4. Backfill around exterior of the Wetwell meets requirements in Section F.
_________
_________
5. Wetwell top pad meets minimum design requirements of Section H or is designed
specifically for this installation by the Certified Engineer.
_________
_________
6. Top pad is designed for:
□ Non-traffic load
□ Traffic Load
Installation was in accordance with Wetwell Installation Instructions (Pub No. MAN 200).
Owner Representative (Print Name)__________________________________________
Owner Representative (Signature)____________________________________________
Date__________________________
Contractor Representative (Print Name)______________________________________
Contractor Representative (Signature)________________________________________
Date___________________________